Following the successful completion of the upper works, Zenith was re-appointed to undertake refurbishment of the lower 40m of the chimney. The works consisted of installing the required strengthening works, removing the existing cladding and coating systems followed by the reapplication of a new high temperature coating, 100mm thick insulation and aluzinc cladding. Access for the works was provided via traditional scaffolding internally and externally. All internal works were carried out under Zenith’s confined space procedures. The strengthening works, including the installation of new steelwork and overplating, were undertaken in accordance with BS EN 1090 Execution class 3.
Zenith has an unrivalled reputation in designing, fabricating and installing safe, innovative bespoke access systems on tall and awkward structures throughout industry. Our dedicated team of structural engineers lead the field and have developed a global reputation for excellence. Also, having the ability to perform a comprehensive range of repair strategies and techniques in-house, Zenith is able to provide a service encompassing the initial concept design completely through to eventual project execution.
Made with FlippingBook Annual report maker