AMP 2020 update

Vector Electricity Asset Management Plan— 2020 Update

5.3

Appendix C – Schedule 12a Asset Condition

Vector Electricity

Company Name AMP Planning Period

1 April 2020 – 31 March 2030

SCHEDULE 12a: REPORTON ASSET CONDITION

This schedule requires a breakdown of asset condi�on by asset class as at the start of the forecast year. The data accuracy assessment relates to the percentage values disclosed in the asset condi�on columns. Also required is a forecast of the percentage of units to be replaced in the next 5 years. All informa�on should be consistent with the informa�on provided in the AMP and the expenditure on assets forecast in Schedule 11a. All units rela�ng to cable and line assets, that are expressed in km, refer to circuit lengths.

sch ref

Asset condi�on at start of planning period (percentage of units by grade)

7 8

% of asset

forecast to be replaced in next 5 years

Grade unknown

Data accuracy

Voltage Asset category

Asset class

Units

H1

H2

H3

H4

H5

(1–4)

9

10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35

All All All HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV

Overhead Line Overhead Line Overhead Line

Concrete poles / steel structure Wood poles Other pole types

No. No. No. km km km km km km km km km km km No. No. No. No. No. No. No. No. No. No. No.

0.01% 0.05%

0.13% 1.11%

21.25% 82.44%

38.28% 12.72%

40.33%

4 4 4 3 3 2 2 2 2 2 2 2 4 4 3 3 3 3 3 3 3

6.33%

3.69%

33.28%

- - - - - - - - - - - - - - - - - - -

- - -

-

-

100.00%

- - -

Subtransmission Line Subtransmission Line Subtransmission Cable Subtransmission Cable Subtransmission Cable Subtransmission Cable Subtransmission Cable Subtransmission Cable Subtransmission Cable Subtransmission Cable Subtransmission Cable

Subtransmission OH up to 66kV conductor Subtransmission OH 110kV+ conductor Subtransmission UG up to 66kV (XLPE) Subtransmission UG up to 66kV (Oil pressurised) Subtransmission UG up to 66kV (Gas pressurised)

90.16% 72.35%

2.56%

7.28%

-

27.65% 58.89%

0.89%

5.57%

34.64% 96.02%

0.89%

-

- -

3.98%

-

100.00% 64.06%

-

-

100.00% 82.86%

Subtransmission UG up to 66kV (PILC) Subtransmission UG 110kV+ (XLPE)

25.17%

8.46%

2.31%

- -

- -

27.96% 93.87%

72.04%

- -

Subtransmission UG 110kV+ (Oil pressurised) Subtransmission UG 110kV+ (Gas Pressurised)

6.13%

N/A N/A

Subtransmission UG 110kV+ (PILC) Subtransmission submarine cable Zone substa�ons up to 66kV Zone substa�ons 110kV+ 22/33kV CB (Indoor) 22/33kV CB (Outdoor) 33kV Switch(Ground Mounted) 33kV Switch(Pole Mounted) 33kV RMU

- - -

4.96% 1.75%

95.04% 79.82% 100.00% 15.60%

-

-

Zone substa�on Buildin gs Zone substa�on Buildin gs Zone substa�on switchgear Zone substa�on switchgear Zone substa�on switchgear Zone substa�on switchgear Zone substa�on switchgear Zone substa�on switchgear Zone substa�on switchgear Zone substa�on switchgear Zone substa�on switchgear

18.42%

3.00%

-

-

-

3.60%

77.20% 29.51%

3.60%

3.60%

21.31%

39.34%

9.84%

30.33%

N/A

23.37%

69.57%

4.35%

2.72%

23.91%

- - -

- -

100.00% 45.00%

-

- - -

55.00%

50/66/110kV CB (Indoor) 50/66/110kV CB (Outdoor)

100.00% 20.18%

-

-

3.3/6.6/11/22kV CB (ground mounted) 3.3/6.6/11/22kV CB (pole mounted)

10.68%

20.92%

48.22%

14.84%

N/A

— 34

Made with FlippingBook Proposal Creator