1) Follow the installation instructions in this manual for Installing the Electric Elements. Ensure that electric elements or 1’NPT plugs are installed and test for leaks. 2) Place insulation pad over the bolts extruding from the tank.
3) Align the junction box with the bolts and push against the insulation gasket.
4) With the nuts provided, tighten the box against the gasket until the gasket compresses slightly.
9
GARN® WHS Electric Heating Package Manual ©DECTRA CORPORATION - May 2016 (Supersedes September 2015 edition)
Made with FlippingBook - professional solution for displaying marketing and sales documents online