3 Final 2022-23 ReserveStudy-07-29-2022 reduced-compressed

Outdoor Resort Palm Springs

Cathedral City, CA

RESERVE STUDY Update "With-Site-Visit"

Report #: 6510-0 Beginning: July 1, 2022 Expires: June 30, 2023

July 29, 2022

A R Welcome to your Reserve Study! Reserve Study is a valuable tool to help you budget responsibly for your property. This report contains all the information you need to avoid surprise expenses, make informed decisions, save money, and protect property values. egardless of the property type, it's a fact of life that the very moment construction is completed, every major building component begins a predictable process of physical deterioration. The operative word is " predictable" because planning for the inevitable is what a Reserve Study by Association Reserves is all about!

In this Report, you will find three key results:

Component List Unique to each property, the Component List serves as the foundation of the Reserve Study and details the scope and schedule of all necessary repairs & replacements. Reserve Fund Strength A calculation that measures how well the Reserve Fund has kept pace with the property's physical deterioration. Reserve Funding Plan A multi-year funding plan based on current Reserve Fund strength that allows for component repairs and replacements to be completed in a timely manner, with an emphasis on fairness and avoiding "catch-up" funding. Questions? Please contact your Project Manager directly.

www.reservestudy.com

Table of Contents

Executive Summary

5

Executive Summary (Component List)

6

Introduction, Objectives, and Methodology

19 20 20 20 21 21 22 23 24

Which Physical Assets are Funded by Reserves?

How do we establish Useful Life and Remaining Useful Life estimates? How do we establish Current Repair/Replacement Cost Estimates?

How much Reserves are enough? How much should we contribute?

What is our Recommended Funding Goal?

Site Inspection Notes Projected Expenses

Annual Reserve Expenses Graph

24

Reserve Fund Status & Recommended Funding Plan

25 25 26

Annual Reserve Funding Graph

30-Yr Cash Flow Graph

Percent Funded Graph

26

Table Descriptions

27 28 29 40 51 62 73

Budget Summary

Reserve Component List Detail

Fully Funded Balance

Component Significance

Accounting & Tax Summary

30-Year Reserve Plan Summary 30-Year Income/Expense Detail

74

Accuracy, Limitations, and Disclosures

122 123 124 125 138 145 156

Terms and Definitions

Component Details

General Common Area

Asphalt & Concrete

Admin Building

La Palma: Clubhouse La Palma: Pool & Spa

197

La Palma: Tennis

211

El Saguaro: Clubhouse El Saguaro: Pool & Spa

216 254 269 274 278 284

El Saguaro: Pickleball

Laundry

Maintenance

Vehicles

Association Reserves, #6510-0

3

7/29/2022

Carts

286 297 321 337 352 367 382 397

Golf

Satellite A Satellite B Satellite C Satellite D Satellite E Satellite F

Association Reserves, #6510-0

4

7/29/2022

Reserve Study Executive Summary

With-Site-Visit

Outdoor Resort Palm Springs

Report #: 6510-0 # of Units: 1,213

Cathedral City, CA

Level of Service: Update "With-Site-Visit"

July 1, 2022 through June 30, 2023

Findings & Recommendations

as of July 1, 2022

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $4,235,542 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $7,408,116 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $2,615 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 57.2 % . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $91,594 Projected Starting Reserve Balance Fully Funded Balance Average Reserve Deficit (Surplus) Per Unit Percent Funded Recommended 2022/2023 Monthly Reserve Contribution

Reserve Fund Strength: 57.2% Weak

Fair

Strong

< 30%

< 70%

> 130%

Risk of Special Assessment:

High Medium

Low

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.00 % . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3.00 % Economic Assumptions: Net Annual "After Tax" Interest Earnings Accruing to Reserves Annual Inflation Rate • This is an Update "With‐Site‐Visit" Reserve Study. • This Reserve Study was prepared by a credentialed Reserve Specialist ﴾RS﴿. • Because the Reserve Fund is at 57.2 % Funded, this means the association’s special assessment & deferred maintenance risk is currently Medium. • The multi‐year Funding Plan is designed to gradually bring the association to the 100% level, or “Fully Funded”. This is a low risk position where special assessments and other cash flow problems are extremely rare. • Based on this starting point, anticipated future expenses, and the association's historical Reserve contribution rate, our recommendation is to budget Monthly Reserve contributions of $91,594. Nominal annual increases are scheduled to help offset inflation ﴾see tables herein for details﴿. • The purpose of the Reserve Study is to serve as a budget planning tool, which incorporates the association's reserve fund balance, budgeted contributions, a list of significant repair/replacement projects, and a recommended funding plan. The component list contains cost estimates and approximate schedules for the association's predictable reserve expenses. These figures are strictly estimates unless otherwise noted. This document is dynamic and, therefore, we recommend that it be updated annually, with an on‐ site inspection update every three years to address changing needs, priorities, and financial conditions.

Association Reserves, #6510-0

5

7/29/2022

Executive Summary Table

Report # 6510-0 With-Site-Visit

Rem. Useful Life (yrs)

Current Average Cost

Useful Life (yrs)

# Component

General Common Area 303 HVAC Systems - Maintain/Replace

$25,000

1

0

$9,000

414 Flag Poles - Replace

35

22

$25,000

501 Perimeter Wall - Repair/Replace

10

2

$20,000

703 Entry Access System - Replace

8

2

$16,000

706 Barrier Arm Operators - Replace

8

2

$7,500

711 RFID Reader - Replace

8

2

$32,000

802 Pole Lights - Replace

20

6

$5,000

803 Landscape Lights - Replace

1

0

$10,500

804 Concrete Bollard Lights - Replace

20

6

$35,000

916 Gatehouse - Refurbish

15

2

$5,500

1006 Maintenance Radios - Replace

5

1

$15,000

1215 Pool Gate Locks - Replace

10

5

$10,000

1401 Signage - Replace

3

1

$15,000

1402 Monument Signs - Replace

20

1

$20,000

1801 Dog Run - Refurbish

10

7

$25,000

1808 Trees - Remove/Replace

1

0

$115,000

1808 Trees - Trim

1

0

$40,000

1812 Landscaping - Refurbish

1

0

$200,000

1830 Entry Ponds - Refurbish

20

12

$7,000

1832 Entry Pond Vault Pump

10

1

$20,000

1832 Entry Ponds Submersible Pumps

4

1

$10,000

4580 Sewer Camera Inspection

3

0

Asphalt & Concrete 201 Asphalt - Resurface (Area 1)

$1,180,000

30

10

$619,000

201 Asphalt - Resurface (Area 2)

30

11

$501,000

201 Asphalt - Resurface (Area 3)

30

12

$100,000

202 Asphalt - Seal/Repair (Area 1)

6

4

$52,000

202 Asphalt - Seal/Repair (Area 2)

6

5

$42,000

202 Asphalt - Seal/Repair (Area 3)

6

6

$279,115

202 Asphalt - Seal/Repair (Area 3) 2023

99

0

$10,000

205 Concrete & Drain - Repair

2

0

$192,500

206 Pavers (Roadway) - Replace

25

16

$15,000

207 Pavers (Roadway) - Seal/Repair

5

0

Admin Building 304 Computers/IT Equip - Update/Replace

$20,000

3

1

$5,000

304 Router - Replace

3

1

$8,500

304 Server - Replace

5

3

Association Reserves, #6510-0

6

7/29/2022

Rem. Useful Life (yrs)

Current Average Cost

Useful Life (yrs)

# Component

$8,500

304 Switches - Replace

3

1

$40,000

305 Surveillance System - Replace

8

6

$20,000

308 POS Systems - Replace

5

2

$5,000

404 Outdoor Furniture - Replace

15

0

$10,000

507 Wood Shade Structure - Replace

25

13

$11,500

601 Carpet - Replace

10

0

$14,000

610 Tile Floor - Replace

30

15

$20,000

717 Exterior Doors & Windows - Replace

40

5

$15,000

902 Furniture - Replace

15

1

$5,000

908 Window Treatments - Replace

10

4

$7,500

909 Restrooms - Refurbish

15

5

$7,500

928 TVs - Replace

6

2

$5,000

1110 Interior Surfaces - Paint

10

4

$5,000

1141 Building Exterior - Paint

10

4

$22,500

1304 Tile Roof - Replace

35

2

$3,500

1306 Flat Roof - Recoat/Repair

10

2

La Palma: Clubhouse 331 Water Heater - Replace (A.O. Smith)

$6,000

15

8

$6,000

331 Water Heater - Replace (Bradford W)

15

7

$3,500

331 Water Heater - Replace (Bradford W)

15

13

$3,000

331 Water Heater - Replace (Whirlpool)

15

7

$20,000

401 Mailboxes - Replace

30

4

$19,500

404 Outdoor Furniture - Replace (Cafe)

15

5

$22,500

417 Metal Shade Structures - Replace

40

25

$10,000

417 Shades/Canopies - Replace

10

5

$5,000

601 Carpet - Replace (Cafe)

10

4

$15,000

601 Carpet - Replace (Clubhouse)

10

4

$11,500

604 LVP Floor (East Room/Post Office)

15

13

$12,800

609 Tile Floor - Replace (Hallways)

30

19

$12,500

610 Tile Floor - Replace (Cafe)

30

4

$10,000

610 Tile Floor - Replace (Kitchen)

30

4

$12,500

613 Wood Floor - Refinish

10

4

$50,000

614 Wood Floor - Replace

30

4

$27,500

615 Fitness Flooring - Replace

10

9

$11,500

618 Convenience Store Flooring -Replace

20

4

$80,000

717 Exterior Doors & Windows - Replace

40

5

$5,000

805 Wall Lights - Replace

20

15

$8,500

807 Chandeliers - Replace

40

4

$7,500

900 Computers/IT Equip - Update/Replace

3

1

$6,000

901 Room Dividers - Replace

15

4

$20,000

902 Furniture - Replace (Board Room)

15

4

$10,000

902 Furniture - Replace (Cafe Indoor)

15

1

Association Reserves, #6510-0

7

7/29/2022

Rem. Useful Life (yrs)

Current Average Cost

Useful Life (yrs)

# Component

$17,500

902 Furniture - Replace (Library)

15

4

$70,000

902 Main Tables/Chairs - Replace

15

2

$5,000

903 Cafe Convection Oven

15

1

$10,000

903 Cafe Dishwasher - Replace

15

1

$7,500

903 Cafe Fire Suppression System

15

8

$4,000

903 Cafe Freezer (Hoshisaki)

15

1

$4,000

903 Cafe Garbage Disposal

15

14

$15,000

903 Cafe Griddle/Range/Ovens

15

1

$4,500

903 Cafe M3 Turbo Air Refrigerator

15

1

$5,000

903 Cafe Mixer - Replace

15

1

$7,500

903 Cafe Range Hood - Replace

20

13

$4,000

903 Cafe Slicer - Replace

15

1

$10,000

903 Cafe Turbo Air Prep/Refrigerators

15

1

$15,000

903 Cafe Walk-in Unit

25

1

$8,000

903 Kitchen Convection Ovens

15

14

$7,500

903 Kitchen Fire Suppression System

15

5

$6,000

903 Kitchen Freezer (Everest)

15

5

$8,000

903 Kitchen Griddle/Range/Ovens

15

14

$5,000

903 Kitchen Range Hood - Replace

20

5

$4,000

903 Kitchen Refrigerator (Everest)

15

5

$50,000

904 Cafe Kitchen - Remodel

25

5

$15,000

904 Kitchen - Remodel

25

5

$35,000

906 Acoustic Panels - Replace

20

4

$15,000

908 Window Treatments - Replace

10

4

$160,000

909 Restrooms - Refurbish (Clubhouse)

20

14

$10,000

909 Restrooms - Refurbish (Fitness)

20

14

$10,000

909 Restrooms - Refurbish (Pool Area)

20

14

$60,000

918 Cardio Equipment (Free Motion)

10

9

$12,500

919 Strength Equip (Nautilus/Paramount)

15

1

$25,000

919 Strength Equipment (Startrak)

15

3

$10,000

920 Free Weights/Racks/Benches

15

3

$5,000

921 Fitness Mirrors - Replace

20

9

$12,500

926 Decor - Replace

15

4

$5,000

927 Bingo Machine - Replace

20

2

$15,000

928 Sound System - Replace

15

4

$30,000

928 TVs - Replace

6

2

$8,500

929 Ice Machine - Replace (Cafe)

8

4

$8,500

929 Ice Machine - Replace (Kitchen)

8

4

$7,500

935 Cabinets & Counters - Replace

25

4

$35,000

1110 Interior Surfaces - Paint

10

4

$27,500

1141 Building Exterior - Paint

10

8

$8,000

1142 Building Trim - Paint/Repair

5

3

Association Reserves, #6510-0

8

7/29/2022

Rem. Useful Life (yrs)

Current Average Cost

Useful Life (yrs)

# Component

$108,000

1304 Tile Roof - Replace

35

2

$19,600

1306 Flat Roof - Replace (Fitness)

20

5

$30,000

1306 Flat Roof-Recoat/Repair (Clubhouse)

10

5

La Palma: Pool & Spa 413 Patio Heaters - Replace

$4,000

5

2

$19,800

503 Metal Fence - Replace

35

13

$12,000

507 Alumawood Shade Structures -Replace

25

9

$4,800

804 Light Fixtures - Replace

20

2

$35,000

1010 Concrete & Planters - Replace

20

19

$12,000

1107 Metal Fence - Paint/Repair

5

3

$45,000

1200 Pool Deck - Resurface

20

19

$15,000

1201 Pool Deck - Seal/Repair

4

3

$32,500

1203 Pool Furniture - Replace

12

3

$40,000

1208 Pool - Resurface

12

11

$9,000

1209 Spa - Resurface (East)

8

7

$9,000

1209 Spa - Resurface (West)

8

6

$20,000

1211 Pool Skimmers - Replace

24

2

$2,500

1221 Pool Filter- Replace (East)

12

8

$2,500

1221 Pool Filter- Replace (West)

12

10

$2,500

1221 Spa Filter- Replace (East)

12

0

$2,500

1221 Spa Filter- Replace (West)

12

10

$5,500

1223 Pool Heater - Replace (East)

10

7

$5,500

1223 Pool Heater - Replace (West)

10

7

$5,500

1223 Spa Heater - Replace (East)

10

2

$5,250

1223 Spa Heater - Replace (West)

10

0

$5,000

1225 Pool/Spa Pumps - Replace

1

0

$10,000

1226 Salt Cells - Replace

3

0

$25,000

1226 Salt Generators - Replace

6

3

$12,000

1228 Pool/Spa ADA Lifts - Replace

15

6

La Palma: Tennis 404 Outdoor Furniture - Replace

$8,500

15

13

$80,000

417 Metal Shade Structures - Replace

40

36

$12,000

417 Shades/Canopies - Replace

10

6

$40,000

502 Chain Link Fence - Replace

35

11

$7,500

1106 Chain Link Fence - Recoat

5

1

$32,000

1609 Tennis Courts - Resurface

5

2

$15,000

1610 Windscreen - Replace

10

6

$48,000

1612 Court Lighting - Replace

25

21

$5,000

1619 Tennis Machines/Equip - Replace

8

2

El Saguaro: Clubhouse 331 Water Heater - Replace (Bradford W)

$8,500

15

2

$8,500

331 Water Heater - Replace (SmartWater)

15

0

Association Reserves, #6510-0

9

7/29/2022

Rem. Useful Life (yrs)

Current Average Cost

Useful Life (yrs)

# Component

$3,000

331 Water Heater - Replace (Whirlpool)

15

7

$20,000

401 Mailboxes - Replace

30

4

$6,500

404 Outdoor Furniture - Replace

15

1

$8,000

416 Awnings - Replace

10

6

$52,000

601 Carpet - Replace

10

1

$11,250

604 LVP Floor (Lifestyle/Post Office)

15

11

$31,000

606 Slate Floor - Replace

30

22

$23,600

609 Tile Floor - Replace (West Room)

30

22

$16,000

610 Tile Floor - Replace (Kitchen)

30

4

$12,500

613 Wood Floor - Refinish

10

4

$55,000

614 Wood Floor - Replace

30

4

$80,000

717 Exterior Doors & Windows - Replace

40

5

$7,500

807 Chandeliers - Replace

40

4

$10,000

808 Stage Lighting - Replace

15

4

$7,500

900 Computers/IT Equip - Update/Replace

3

1

$6,000

901 Room Dividers - Replace

15

4

$10,000

902 Furniture - Replace (Lifestyle)

15

12

$90,000

902 Furniture - Replace (Owners Lounge)

15

7

$70,000

902 Main Tables/Chairs - Replace

15

2

$8,000

902 Poker Tables/Chairs - Replace

15

2

$22,000

902 Theater Chairs - Replace

20

0

$10,000

903 Bar Draft Beer System - Replace

15

7

$8,000

903 Bar Refrigeration - Replace

15

7

$7,500

903 Bar Sinks/Racks - Replace

15

7

$16,000

903 Kitchen Convection Ovens

15

14

$10,000

903 Kitchen Dishwasher - Replace

15

14

$7,500

903 Kitchen Fire Suppression System

15

14

$21,000

903 Kitchen Freezers (Delfield)

15

14

$4,000

903 Kitchen Garbage Disposal

15

14

$7,500

903 Kitchen Range Hood - Replace

20

19

$17,500

903 Kitchen Range/Griddle

15

14

$9,500

903 Kitchen Refrigerator (Delfield)

15

14

$30,000

903 Kitchen Walk-in Refrigerator

25

14

$9,000

903 Kitchen Warming Drawers - Replace

15

14

$5,000

903 Owners Lounge Beer System

15

7

$6,500

903 Owners Lounge Dishwasher

15

7

$5,000

903 Owners Lounge Refrigeration

15

7

$6,000

903 Owners Lounge Sinks/Racks

15

7

$4,000

903 Poker Room Refrigerator

15

7

$15,000

904 Bar - Remodel (Main)

25

17

$10,000

904 Bar - Remodel (Owners Lounge)

25

17

$50,000

904 Kitchen - Remodel

25

14

Association Reserves, #6510-0

10

7/29/2022

Rem. Useful Life (yrs)

Current Average Cost

Useful Life (yrs)

# Component

$7,500

906 Acoustic Panels - Replace

20

4

$5,000

907 Stage Curtains - Replace

20

4

$15,000

908 Window Treatments - Replace

10

4

$25,000

909 Restrooms - Refurb (Owners Lounge)

20

13

$70,000

909 Restrooms - Refurbish (East)

20

12

$70,000

909 Restrooms - Refurbish (West)

20

14

$10,000

914 Espresso Bar - Refurbish

20

4

$12,500

915 Beauty Shop - Refurbish

20

4

$8,000

924 Billiard Tables - Replace

25

7

$15,000

926 Decor - Replace

15

7

$10,000

928 Owners Lounge AV System - Replace

10

0

$15,000

928 Sound System - Replace

15

4

$25,000

928 TVs - Replace

6

2

$5,500

929 Ice Machine - Repl (Owners Lounge)

8

6

$8,500

929 Ice Machine - Replace (Follett)

8

4

$8,500

929 Ice Machine - Replace (Hoshisaki)

8

4

$8,500

929 Ice Machine - Replace (Manitowok)

8

4

$17,500

935 Cabinets & Counters - Replace

25

17

$35,000

1110 Interior Surfaces - Paint

10

4

$27,500

1141 Building Exterior - Paint

10

8

$8,000

1142 Building Trim - Paint/Repair

5

3

$172,500

1304 Tile Roof - Replace

35

20

$20,000

1306 Flat Roof - Recoat/Repair

10

3

El Saguaro: Pool & Spa 404 Outdoor Furniture - Replace

$12,500

15

7

$4,000

412 BBQs - Replace

15

12

$10,000

413 Patio Heaters - Replace

5

2

$60,000

417 Metal Shade Structures - Replace

40

36

$10,000

417 Shades/Canopies - Replace

10

6

$6,000

419 Outdoor Showers - Refurbish

15

11

$33,000

503 Metal Fence - Replace

35

13

$15,000

507 Alumawood Shade Structure - Replace

25

9

$20,000

507 Wood Shade Structure - Replace

25

9

$8,000

804 Bollard Lights - Replace

20

16

$12,000

1107 Metal Fence - Paint/Repair

5

3

$330,000

1200 Pool Deck - Replace

25

23

$32,500

1203 Pool Furniture - Replace

12

3

$6,500

1208 Pool - Resurface (Kiddie)

12

9

$37,500

1208 Pool - Resurface (Main)

12

9

$9,000

1209 Spa - Resurface (North)

8

5

$9,000

1209 Spa - Resurface (South)

8

5

$22,500

1211 Pool Skimmers - Replace

24

20

Association Reserves, #6510-0

11

7/29/2022

Rem. Useful Life (yrs)

Current Average Cost

Useful Life (yrs)

# Component

$15,000

1221 Pool/Spa Filters - Replace

12

1

$5,500

1223 Pool Heater - Replace (#1)

10

7

$5,500

1223 Pool Heater - Replace (#2)

10

7

$5,000

1223 Pool Heater - Replace (Kiddie)

10

1

$5,500

1223 Spa Heater - Replace (#1)

10

1

$5,500

1223 Spa Heater - Replace (#2)

10

1

$5,000

1225 Pool/Spa Pumps - Replace

1

0

$10,000

1226 Salt Cells - Replace

3

0

$25,000

1226 Salt Generators - Replace

6

3

El Saguaro: Pickleball 417 Metal Shade Structures - Replace

$85,000

40

36

$12,000

417 Shades/Canopies - Replace

10

6

$40,000

502 Chain Link Fence - Replace

35

11

$7,500

1106 Chain Link Fence - Recoat

5

1

$16,000

1609 Pickleball Courts -Resurface (East)

5

4

$16,000

1609 Pickleball Courts -Resurface (West)

5

2

$15,000

1610 Windscreen - Replace

10

6

$60,000

1612 Court Lighting - Replace

25

20

Laundry 331 Water Heater - Replace

$8,500

15

0

$10,000

610 Tile Floor - Replace

30

2

$4,000

703 Card Dispenser Unit - Replace

12

2

$68,000

923 Laundry Machines - Replace

8

6

$2,500

928 TV - Replace

6

2

$17,500

1141 Building - Paint/Refurbish

10

4

$5,000

1306 Flat Roof - Recoat/Repair

10

1

Maintenance 507 Shade Structures -Replace

$20,000

25

6

$8,500

929 Ice Machine - Replace

8

1

$17,500

1141 Building - Paint/Refurbish

10

4

$14,000

1306 Flat Roof - Replace

20

1

$54,000

1550 Mobile Office Trailers - Replace

25

1

$10,000

1815 Air Compressor (S-4) - Replace

15

5

$22,500

1860 Trailer, Big Tex (T-21) - Replace

20

1

$100,000

1861 Sweeper, Street-Green Machine

15

12

$70,000

1862 Tactor, Case (T-19) - Replace

20

0

$40,000

1863 Scissor Lift - Replace

15

1

Vehicles 3310 Ford F150 - Replace

$35,000

10

1

$50,000

3310 Ford F450 - Replace

10

1

$85,000

3310 Ford F550 - Replace

10

5

$35,000

3310 Ford Ranger - Replace

10

1

Association Reserves, #6510-0

12

7/29/2022

Rem. Useful Life (yrs)

Current Average Cost

Useful Life (yrs)

# Component

Carts 3320 CART, 6 passenger (30)(FO)

$12,500

5

1

$12,500

3320 CART, Industrial ‐ 2673771(03)(PO)

5

2

$12,500

3320 CART, Industrial ‐ 2674519(09)(IR)

5

2

$12,500

3320 CART, Industrial ‐ 2675344(02)(PO)

5

2

$9,000

3320 CART, MPT1000 ‐ 2672812(23)(HK)

5

0

$9,000

3320 CART, MPT1000 ‐ 2672814(18)(HK)

5

2

$9,000

3320 CART, MPT1000 ‐ 2672816(22)(AT)

5

2

$9,000

3320 CART, MPT1000 ‐ 2673159(24)(GD)

5

2

$12,500

3320 CART, MPT1000 ‐ 2673214(20)(MT)

5

2

$10,000

3320 CART, MPT1000 ‐ 2673223(27)(GM)

5

2

$9,000

3320 CART, MPT1000 ‐ 2673226(10)(MT)

5

2

$9,000

3320 CART, MPT1000 ‐ 2673229(25)(PO)

5

2

$9,000

3320 CART, MPT1000 ‐ 2673230(28)(MT)

5

0

$12,500

3320 CART, MPT1000 ‐ 2673315(26)(MT)

5

1

$9,000

3320 CART, MPT1000 ‐ 2673363(11)(AT)

5

2

$9,000

3320 CART, MPT1000 ‐ 2673367(19)(SE)

5

0

$9,000

3320 CART, MPT1000 ‐ 2673371(12) HiSpeedAD

5

2

$9,000

3320 CART, MPT1000 ‐ 2673374(14) HiSpeedSE

5

2

$9,000

3320 CART, MPT1000 ‐ 2673474(16)(MR)

5

2

$9,000

3320 CART, MPT1000 ‐ 2673475(15) HiSpeedSE

5

2

$9,000

3320 CART, MPT1000 ‐ 2673476(13) HiSpeedSE

5

0

$9,000

3320 CART, MPT1000 ‐ 3673211(21)(MT)

5

0

Golf 411 Drinking Fountains - Replace

$36,000

10

9

$7,500

916 Starter Building - Refurbish

15

5

$10,000

1002 Irrigation Computer/Software

8

0

$55,000

1003 Irrigation Controllers - Replace

15

5

$17,500

1006 Weather Station - Replace

15

5

$12,500

1007 Irrigation System - Repair/Replace

1

0

$25,000

1701 Bridge - Replace/Rebuild (F#1)

15

4

$225,000

1950 Pump Station #1 - Replace

20

10

$200,000

1950 Pump Station #2 - Replace

20

10

$10,000

1960 Well Pump/Motor 125hp - Replace

20

0

$10,000

1960 Well Pump/Motor 40hp - Replace

20

7

$25,000

1962 Well Control Systems - Replace

20

10

$20,000

2000 Fountain Pumps - Replace (F#1)

10

5

$10,000

2001 Waterfall Pump - Replace (F#1)

10

1

$135,000

2002 Lake Liner - Replace (F#1)

20

15

$24,000

2003 Lake Shoreline - Repair (F#1)

20

15

$95,000

2004 Lake - Dredge (F#1)

10

0

$20,000

2010 Fountain Pumps - Replace (F#4)

10

5

Association Reserves, #6510-0

13

7/29/2022

Rem. Useful Life (yrs)

Current Average Cost

Useful Life (yrs)

# Component

$165,000

2011 Lake Liner - Replace (F#4)

20

15

$25,000

2012 Lake Shoreline - Repair (F#4)

20

15

$95,000

2013 Lake - Dredge (F#4)

10

0

$20,000

2020 Fountain Pumps - Replace (F#11)

10

0

$200,000

2021 Lake Liner - Replace (F#11)

20

0

$30,000

2022 Lake Shoreline - Repair (F#11)

20

0

$95,000

2024 Lake - Dredge (F#11)

10

10

$20,000

2030 Fountain Pumps - Replace (B#2)

10

2

$42,500

2031 Lake Liner - Replace (B#2)

20

12

$22,500

2032 Lake Shoreline - Repair (B#2)

20

12

$95,000

2033 Lake - Dredge (B#2)

10

8

$20,000

2040 Fountain Pumps - Replace (B#4)

10

2

$85,000

2041 Lake Liner - Replace (B#4)

20

12

$23,000

2042 Lake Shoreline - Repair (B#4)

20

12

$95,000

2043 Lake - Dredge (B#4)

10

8

$10,000

2050 Fountain Pump - Replace (B#6)

10

2

$125,000

2051 Lake Liner - Replace (B#6)

20

12

$23,500

2052 Lake Shoreline - Repair (B#6)

20

12

$95,000

2053 Lake - Dredge (B#6)

10

8

$10,000

2060 Fountain Pump - Replace (B#9)

10

2

$40,000

2061 Lake Liner - Replace (B#9)

20

12

$22,000

2062 Lake Shoreline - Repair (B#9)

20

12

$95,000

2063 Lake - Dredge (B#9)

10

8

$15,000

3000 Tees/Greens - Restore/Replace

1

0

$10,000

3002 Golf Fixtures - Replace

1

0

$27,000

3003 Hole Monument Signs - Replace

20

5

Satellite A 331 Water Heater - Replace

$8,500

15

13

$10,000

502 Chain Link Fence - Replace

35

11

$13,000

503 Metal Fence - Replace

35

13

$5,000

507 Alumawood Equip Cover - Replace

25

11

$3,000

802 Pole Lights - Replace

20

2

$20,000

909 Restrooms - Refurbish

20

7

$10,000

930 Laundry - Refurbish

20

7

$3,600

1106 Chain Link Fence - Recoat

5

0

$4,000

1107 Metal Fence - Paint/Repair

5

3

$5,000

1141 Building - Paint/Repair

10

4

$20,000

1200 Pool Deck - Resurface

20

12

$6,000

1201 Pool Deck - Seal/Repair

4

0

$15,000

1203 Pool Furniture - Replace

12

3

$17,500

1208 Pool - Resurface

12

9

$8,000

1209 Spa - Resurface

8

5

Association Reserves, #6510-0

14

7/29/2022

Rem. Useful Life (yrs)

Current Average Cost

Useful Life (yrs)

# Component

$7,500

1211 Pool Skimmers - Replace

24

4

$3,000

1213 Outdoor Shower - Refubish

20

7

$2,500

1221 Pool Filter - Replace

12

2

$2,500

1222 Spa Filter - Replace

12

4

$5,500

1223 Pool Heater - Replace

10

9

$5,500

1224 Spa Heater - Replace

10

1

$3,000

1225 Pool/Spa Pumps - Replace

1

0

$4,000

1226 Salt Cells - Replace

3

0

$10,000

1226 Salt Generators - Replace

6

3

$11,500

1304 Tile Roof - Replace

35

2

$10,000

1312 Solar System - Replace

15

5

$8,500

1609 Tennis Court - Resurface

5

2

$3,600

1610 Windscreen - Replace

10

2

$12,000

1612 Tennis Court Lighting - Replace

25

2

Satellite B 331 Water Heater - Replace

$8,500

15

0

$10,000

502 Chain Link Fence - Replace

35

13

$13,000

503 Metal Fence - Replace

35

13

$5,000

507 Alumawood Equip Cover - Replace

25

11

$2,250

802 Pole Lights - Replace

20

2

$20,000

909 Restrooms - Refurbish

20

7

$10,000

930 Laundry - Refurbish

20

7

$3,600

1106 Chain Link Fence - Recoat

5

0

$4,000

1107 Metal Fence - Paint/Repair

5

3

$5,000

1141 Building - Paint/Repair

10

4

$20,000

1200 Pool Deck - Resurface

20

8

$6,000

1201 Pool Deck - Seal/Repair

4

0

$15,000

1203 Pool Furniture - Replace

12

3

$17,500

1208 Pool - Resurface

12

1

$8,000

1209 Spa - Resurface

8

5

$7,500

1211 Pool Skimmers - Replace

24

4

$3,000

1213 Outdoor Shower - Refubish

20

7

$2,500

1221 Pool Filter - Replace

12

7

$2,500

1222 Spa Filter - Replace

12

11

$5,500

1223 Pool Heater - Replace

10

7

$5,500

1224 Spa Heater - Replace

10

0

$3,000

1225 Pool/Spa Pumps - Replace

1

0

$4,000

1226 Salt Cells - Replace

3

0

$10,000

1226 Salt Generators - Replace

6

3

$11,500

1304 Tile Roof - Replace

35

2

$8,500

1609 Tennis Court - Resurface

5

2

$3,600

1610 Windscreen - Replace

10

2

Association Reserves, #6510-0

15

7/29/2022

Rem. Useful Life (yrs)

Current Average Cost

Useful Life (yrs)

# Component

$12,000

1612 Tennis Court Lighting - Replace

25

2

Satellite C 331 Water Heater - Replace

$8,500

15

10

$10,000

502 Chain Link Fence - Replace

35

13

$13,000

503 Metal Fence - Replace

35

13

$5,000

507 Alumawood Equip Cover - Replace

25

11

$2,250

802 Pole Lights - Replace

20

2

$20,000

909 Restrooms - Refurbish

20

4

$10,000

930 Laundry - Refurbish

20

4

$3,600

1106 Chain Link Fence - Recoat

5

0

$4,000

1107 Metal Fence - Paint/Repair

5

3

$5,000

1141 Building - Paint/Repair

10

4

$20,000

1200 Pool Deck - Resurface

20

12

$6,000

1201 Pool Deck - Seal/Repair

4

0

$15,000

1203 Pool Furniture - Replace

12

3

$17,500

1208 Pool - Resurface

12

4

$8,000

1209 Spa - Resurface

8

4

$7,500

1211 Pool Skimmers - Replace

24

4

$3,000

1213 Outdoor Shower - Refubish

20

4

$2,500

1221 Pool Filter - Replace

12

0

$2,500

1222 Spa Filter - Replace

12

0

$5,500

1223 Pool Heater - Replace

10

7

$5,500

1224 Spa Heater - Replace

10

1

$3,000

1225 Pool/Spa Pumps - Replace

1

0

$4,000

1226 Salt Cells - Replace

3

0

$10,000

1226 Salt Generators - Replace

6

3

$11,500

1304 Tile Roof - Replace

35

2

$8,500

1609 Tennis Court - Resurface

5

2

$3,600

1610 Windscreen - Replace

10

2

$12,000

1612 Tennis Court Lighting - Replace

25

2

Satellite D 331 Water Heater - Replace

$8,500

15

7

$10,000

502 Chain Link Fence - Replace

35

13

$13,000

503 Metal Fence - Replace

35

13

$5,000

507 Alumawood Equip Cover - Replace

25

11

$2,250

802 Pole Lights - Replace

20

2

$25,000

909 Restrooms - Refurbish

20

4

$10,000

930 Laundry - Refurbish

20

4

$3,600

1106 Chain Link Fence - Recoat

5

0

$4,000

1107 Metal Fence - Paint/Repair

5

3

$5,000

1141 Building - Paint/Repair

10

4

$20,000

1200 Pool Deck - Resurface

20

12

Association Reserves, #6510-0

16

7/29/2022

Rem. Useful Life (yrs)

Current Average Cost

Useful Life (yrs)

# Component

$6,000

1201 Pool Deck - Seal/Repair

4

0

$15,000

1203 Pool Furniture - Replace

12

3

$17,500

1208 Pool - Resurface

12

5

$8,000

1209 Spa - Resurface

8

5

$7,500

1211 Pool Skimmers - Replace

24

4

$3,000

1213 Outdoor Shower - Refubish

20

4

$2,500

1221 Pool Filter - Replace

12

0

$2,500

1222 Spa Filter - Replace

12

4

$5,500

1223 Pool Heater - Replace

10

7

$5,500

1224 Spa Heater - Replace

10

1

$3,000

1225 Pool/Spa Pumps - Replace

1

0

$4,000

1226 Salt Cells - Replace

3

0

$10,000

1226 Salt Generators - Replace

6

3

$11,500

1304 Tile Roof - Replace

35

2

$8,500

1609 Tennis Court - Resurface

5

2

$3,600

1610 Windscreen - Replace

10

2

$12,000

1612 Tennis Court Lighting - Replace

25

2

Satellite E 331 Water Heater - Replace

$8,500

15

3

$10,000

502 Chain Link Fence - Replace

35

13

$13,000

503 Metal Fence - Replace

35

13

$5,000

507 Alumawood Equip Cover - Replace

25

11

$3,750

802 Pole Lights - Replace

20

2

$20,000

909 Restrooms - Refurbish

20

7

$10,000

930 Laundry - Refurbish

20

7

$3,600

1106 Chain Link Fence - Recoat

5

0

$4,000

1107 Metal Fence - Paint/Repair

5

3

$5,000

1141 Building - Paint/Repair

10

4

$20,000

1200 Pool Deck - Resurface

20

8

$6,000

1201 Pool Deck - Seal/Repair

4

0

$15,000

1203 Pool Furniture - Replace

12

3

$17,500

1208 Pool - Resurface

12

4

$8,000

1209 Spa - Resurface

8

4

$7,500

1211 Pool Skimmers - Replace

24

4

$3,000

1213 Outdoor Shower - Refubish

20

7

$2,500

1221 Pool Filter - Replace

12

8

$2,500

1222 Spa Filter - Replace

12

4

$5,500

1223 Pool Heater - Replace

10

7

$5,500

1224 Spa Heater - Replace

10

1

$3,000

1225 Pool/Spa Pumps - Replace

1

0

$4,000

1226 Salt Cells - Replace

3

0

$10,000

1226 Salt Generators - Replace

6

3

Association Reserves, #6510-0

17

7/29/2022

Rem. Useful Life (yrs)

Current Average Cost

Useful Life (yrs)

# Component

$11,500

1304 Tile Roof - Replace

35

2

$8,500

1609 Tennis Court - Resurface

5

2

$3,600

1610 Windscreen - Replace

10

2

$12,000

1612 Tennis Court Lighting - Replace

25

2

Satellite F 331 Water Heater - Replace

$5,000

15

12

$10,000

502 Chain Link Fence - Replace

35

13

$13,000

503 Metal Fence - Replace

35

13

$5,000

507 Alumawood Equip Cover - Replace

25

11

$3,750

802 Pole Lights - Replace

20

2

$20,000

909 Restrooms - Refurbish

20

7

$10,000

930 Laundry - Refurbish

20

7

$4,000

1107 Metal Fence - Paint/Repair

5

3

$20,000

1200 Pool Deck - Resurface

20

8

$6,000

1201 Pool Deck - Seal/Repair

4

0

$15,000

1203 Pool Furniture - Replace

12

3

$17,500

1208 Pool - Resurface

12

3

$8,000

1209 Spa - Resurface

8

3

$3,000

1213 Outdoor Shower - Refubish

20

7

$2,500

1221 Pool Filter - Replace

12

0

$2,500

1222 Spa Filter - Replace

12

8

$5,500

1223 Pool Heater - Replace

10

1

$5,500

1224 Spa Heater - Replace

10

1

$3,000

1225 Pool/Spa Pumps - Replace

1

0

$4,000

1226 Salt Cells - Replace

3

0

$10,000

1226 Salt Generators - Replace

6

3

$11,500

1304 Tile Roof - Replace

35

2

$8,500

1609 Tennis Court - Resurface

5

2

$3,600

1610 Windscreen - Replace

10

2

$12,000

1612 Tennis Court Lighting - Replace

25

2

510 Total Funded Components

Association Reserves, #6510-0

18

7/29/2022

Introduction

A Reserve Study is the art and science of anticipating, and preparing for, an association's major common area repair and replacement expenses. Partially art, because in this field we are making projections about the future. Partially science, because our work is a combination of research and well- defined computations, following consistent National Reserve Study Standard principles.

The foundation of this and every Reserve Study is your Reserve Component List (what you are reserving for). This is because the Reserve Component List defines the scope and schedule of all your anticipated upcoming Reserve projects. Based on that List and your starting balance, we calculate the association's Reserve Fund Strength (reported in terms of "Percent Funded"). Then we compute a Reserve Funding Plan to provide for the Reserve needs of the association. These form the three results of your Reserve Study.

Reserve contributions are not “for the future”. Reserve contributions are designed to offset the ongoing, daily deterioration of your Reserve assets. Done well, a stable, budgeted Reserve Funding Plan will collect sufficient funds from the owners who enjoyed the use of those assets, so the association is financially prepared for the irregular expenditures scattered through future years when those projects eventually require replacement.

Methodology

For this Update With-Site-Visit Reserve Study, we started with a review of your prior Reserve Study, then looked into recent Reserve expenditures, evaluated how expenditures are handled (ongoing maintenance vs Reserves), and researched any well-established association

precedents. We performed an on-site inspection to evaluate your common areas, updating and adjusting your Reserve Component List as appropriate.

Association Reserves, #6510-0

19

7/29/2022

Which Physical Assets are Funded by Reserves?

There is a national-standard four-part test to determine which expenses should appear in your Reserve Component List. First, it must be a common area maintenance responsibility. Second, the component must have a limited life. Third, the remaining life must be predictable (or it by definition is a surprise which cannot be accurately anticipated). Fourth, the component must be above a minimum threshold cost (often between .5% and 1% of an association's total budget). This limits Reserve

Components to major, predictable expenses. Within this framework, it is inappropriate to include lifetime components, unpredictable expenses (such as damage due to fire, flood, or earthquake), and expenses more appropriately handled from the Operational Budget or as an insured loss. How do we establish Useful Life and Remaining Useful Life estimates? 1) Visual Inspection (observed wear and age) 2) Association Reserves database of experience 3) Client History (install dates & previous life cycle information) 4) Vendor Evaluation and Recommendation How do we establish Current Repair/Replacement Cost Estimates?

In this order...

1) Actual client cost history, or current proposals 2) Comparison to Association Reserves database of work done at similar associations 3) Vendor Recommendations 4) Reliable National Industry cost estimating guidebooks

Association Reserves, #6510-0

20

7/29/2022

Page 1 Page 2 Page 3 Page 4 Page 5 Page 6 Page 7 Page 8 Page 9 Page 10 Page 11 Page 12 Page 13 Page 14 Page 15 Page 16 Page 17 Page 18 Page 19 Page 20 Page 21 Page 22 Page 23 Page 24 Page 25 Page 26 Page 27 Page 28 Page 29 Page 30 Page 31 Page 32 Page 33 Page 34 Page 35 Page 36 Page 37 Page 38 Page 39 Page 40 Page 41 Page 42 Page 43 Page 44 Page 45 Page 46 Page 47 Page 48 Page 49 Page 50 Page 51 Page 52 Page 53 Page 54 Page 55 Page 56 Page 57 Page 58 Page 59 Page 60 Page 61 Page 62 Page 63 Page 64 Page 65 Page 66 Page 67 Page 68 Page 69 Page 70 Page 71 Page 72 Page 73 Page 74 Page 75 Page 76 Page 77 Page 78 Page 79 Page 80 Page 81 Page 82 Page 83 Page 84 Page 85 Page 86 Page 87 Page 88 Page 89 Page 90 Page 91 Page 92 Page 93 Page 94 Page 95 Page 96 Page 97 Page 98 Page 99 Page 100 Page 101 Page 102 Page 103 Page 104 Page 105 Page 106 Page 107 Page 108 Page 109 Page 110 Page 111 Page 112 Page 113 Page 114 Page 115 Page 116 Page 117 Page 118 Page 119 Page 120 Page 121 Page 122 Page 123 Page 124 Page 125 Page 126 Page 127 Page 128 Page 129 Page 130 Page 131 Page 132 Page 133 Page 134 Page 135 Page 136 Page 137 Page 138 Page 139 Page 140 Page 141 Page 142 Page 143 Page 144 Page 145 Page 146 Page 147 Page 148 Page 149 Page 150 Page 151 Page 152 Page 153 Page 154 Page 155 Page 156 Page 157 Page 158 Page 159 Page 160 Page 161 Page 162 Page 163 Page 164 Page 165 Page 166 Page 167 Page 168 Page 169 Page 170 Page 171 Page 172 Page 173 Page 174 Page 175 Page 176 Page 177 Page 178 Page 179 Page 180 Page 181 Page 182 Page 183 Page 184 Page 185 Page 186 Page 187 Page 188 Page 189 Page 190 Page 191 Page 192 Page 193 Page 194 Page 195 Page 196 Page 197 Page 198 Page 199 Page 200