Comp #: 703 Entry Access System - Replace
Quantity: (1) System
Location: Entry Funded?: Yes. History: Unknown
Comments: This component provides an allowance for various pieces of the access system. This includes, but is not limited to, card readers, scanners, computers, printers, etc. Individual components can often be replaced for relatively low cost as an Operating expense. Plan for complete replacement at the approximate interval shown here for functional and aesthetic considerations.
Useful Life: 8 years
Remaining Life: 2 years
Best Case: $ 15,000
Worst Case: $ 25,000
Cost Source: Allowance Estimate
Comp #: 706 Barrier Arm Operators - Replace
Quantity: (3) Operators
Location: Entry/Exit Funded?: Yes. History: Manufactured date: 2016
Comments: Funding recommendation is primarily for the motor/mechanical unit, not the arm itself, which is generally replaced as an Operating/maintenance expense as needed. Life expectancy can vary based on level of use, exposure to the elements, level of preventive maintenance, etc. Should be inspected and repaired as needed by servicing vendor to attain full life expectancy.
Useful Life: 8 years
Remaining Life: 2 years
Best Case: $ 14,000
Worst Case: $ 18,000
Cost Source: Allowance Estimate
Association Reserves, #6510-0
127
7/29/2022