3 Final 2022-23 ReserveStudy-07-29-2022 reduced-compressed

Comp #: 507 Alumawood Shade Structure - Replace

Quantity: (1) Total; ~1,100 GSF

Location: Pool Equipment Funded?: Yes. History: Unknown Comments: Assuming ordinary care and maintenance, plan for replacement at roughly the interval indicated below.

Useful Life: 25 years

Remaining Life: 9 years

Best Case: $ 12,000

Worst Case: $ 18,000

Cost Source: Allowance Estimate

Comp #: 507 Wood Shade Structure - Replace

Quantity: (1) Total; ~880 GSF

Location: West end of pool area Funded?: Yes. History: Unknown

Comments: As routine maintenance, inspect regularly and repair individual pieces or sections as needed from general Operating funds. Clean and paint/stain along with other larger projects or as general maintenance to preserve the appearance of the trellis and extend its useful life. Assuming ordinary care and maintenance, plan for major repairs or possibly complete replacement (if warranted) at roughly the interval indicated below.

Useful Life: 25 years

Remaining Life: 9 years

Best Case: $ 15,000

Worst Case: $ 25,000

Cost Source: Allowance Estimate

Association Reserves, #6510-0

258

7/29/2022

Made with FlippingBook - Online magazine maker