Comp #: 1701 Bridge - Replace/Rebuild (F#1)

Quantity: (1) Bridge

Location: Hole #1 Funded?: Yes. History: 2011

Comments: Bridge is in need of painting and repairs at this time, complete as a maintenance expense. Assuming normal wear and tear and good preventive maintenance, complete replacement or reconstruction may be required at longer intervals, including some or all components of structural framework, pilings, etc. In our experience, all such projects are unique, and we strongly recommend consulting with engineers or experienced contractors to properly determine existing conditions and required scope of work. Our inspection is visual only and limited to accessible areas, and does not incorporate any specific testing or thorough structural evaluation. Life and cost estimates shown here are intended for planning and budgeting purposes, and may need to be re-evaluated in light of any more thorough analysis or other outside information.

Useful Life: 15 years

Remaining Life: 4 years

Best Case: $ 20,000

Worst Case: $ 30,000

Cost Source: Allowance Estimate

Association Reserves, #6510-0

300

7/29/2022

Made with FlippingBook - Online magazine maker