3 Final 2022-23 ReserveStudy-07-29-2022 reduced-compressed

Comp #: 1950 Pump Station #2 - Replace Location: North of Lake on Hole #6 (Back 9) Funded?: Yes. History: 2012

Quantity: (1) Allowance

Comments: (1) Control Panel Pump Station Motors: (2) 30HP (1) Filter: Tekleen (1) Alumawood Shade Structure

The pump station is one of the most complicated components of the irrigation system. It has not only physical components that wear but electronic and electrical components that are in need of periodic maintenance, servicing and replacement. There are a number of factors that play into a pump station maintenance/repair/replace schedule. The water quality being pumped, the numbers of hours the pumps operate, the times per hour the pumps cycle on and off, the controls system running them, and the power being supplied to the system. Make repairs and minor replacements as needed as an operating expense. Planning for comprehensive replacement on roughly the schedule below. Continue to monitor and adjust as needed in future Reserve Study updates.

Useful Life: 20 years

Remaining Life: 10 years

Best Case: $ 180,000

Worst Case: $ 220,000

Cost Source: Allowance Estimate

Comp #: 1960 Well Pump/Motor 125hp - Replace

Quantity: (1) 125 HP

Location: Front well adjacent to gatehouse Funded?: Yes. History: Unknown Comments: (1) 125HP Motor. Make repairs as needed as an operating expense.

Useful Life: 20 years

Remaining Life: 0 years

Best Case: $ 8,000

Worst Case: $ 12,000

Cost Source: Estimate Provided by Client

Association Reserves, #6510-0

302

7/29/2022

Made with FlippingBook - Online magazine maker