Lockers: The general forms of the original lockers on the upper level are intact, however many of the locker doors have been removed for pottery storage. The smaller doors on top are all in place. The lockers are currently used for storage and are in fair condition. Finishes - Metal Exterior Stair: The exterior stair is not original to the building. There is evidence that there was a previous exterior staircase to the upper level that was installed in a slightly different location. The exterior stair is in poor condition. It is not well secured to the building and is corroding in multiple areas. Ceiling Tiles: The painted metal ceiling tiles are not original to the structure and were likely added after the period of significance in order to look historic. They are in good condition. Indication of the fire pole opening is visible from the first and second floors.
Figure 1-16. Lockers, 2020 (source: Ratio)
Figure 1-17. Roof framing in attic, 2020 (source: Ratio)
Figure 1-18. Exterior staircase, 2020 (source: Ratio)
Figure 1-19. Evidence of previous exterior stair landing, 2020 (source: Ratio)
Figure 1-20. Lower level ceiling, 2020 (source: Ratio)
Figure 1-21. Original fire pole location, 2020 (source: Ratio)
4-16
Boulder Fire Station No. 2
Made with FlippingBook Ebook Creator