Boulder Historic Places Plan

Top Priorities The following actions to improve or repair physical features or landscape characteristics are the top recommended priorities. These actions meet the following criteria: impact for safety / stabilization; threat of loss of integrity; poor condition; potential impact due to enhancement; critical path / adjacency to other planned work; or relevancy to other current plans.

These priorities do not diminish the necessity to complete all recommendations to protect the structure over the long term, but rather highlight the current highest priorities.

1 - Conduct repairs for the safety and stabilization of Boulder Fire Station No. 2. • Further investigate second floor framing and strengthen as necessary. • Repair exterior steel fire escape.

2 - Conduct repairs to improve the condition of Boulder Fire Station No. 2. • Repair corroding lintels and deteriorating mortar joints in brick masonry. • Conduct feasibility study for adding an elevator or a lift for accessibility.

4-30