Architectural Condition Concrete

Sidewalk: In the current building location, the rear (north elevation) entrance is accessed from an accessible concrete ramp. The ramp was added when the building was relocated and rehabilitated and is in good condition. The building entry on the south elevation has a concrete pad at the bottom of the stairs that is in good condition.

Building Foundations: The building and porch appear to have been set on new concrete foundations as part of the relocation and rehabilitation. The concrete appears to be in good condition. Refer to structural analysis.

Figure 1-4. Concrete sidewalk at the accessible entrance, 2020 (source: Ratio)

Figure 1-5. Concrete slab at the base of the stairs, 2020 (source: Ratio)

Figure 1-6. Porch and building foundations, 2020 (source: Ratio)

Figure 1-7. Porch columns, 2020 (source: Ratio)