Boulder Historic Places Plan

Additional Items Tile Floors: Both the kitchen and the restroom have tile finishes. The tile is in good condition.

Mechanical: The swamp cooler and furnace for the building appear to be in working condition. They are located in the crawl space below the building, that is accessed behind the slatted wood screens below the porch. A building systems engineer will need to be procured by the city to conduct a thorough analysis to confirm compliance and performance of existing systems. Attic: The attic was partially renovated into an office space, likely at the time of relocation. The rest of the attic remained unfinished and is accessed through access panels on the added partition wall. There are two wall panels that appear to be the access for the unfinished attic space. In both access panels there is a hole cut into them. It is unclear the intent of the holes or if there is a grille missing from these locations. Otherwise the attic spaces are in good condition.

Chimney: The remains of the brick chimney above the roof are visually in good condition, however, a roof consultant should conduct an analysis to confirm.

Figure 1-19. Kitchen area with tile floor, 2020 (source: Ratio)

Figure 1-20. Restroom tile finishes, 2020 (source: Ratio)

Figure 1-21. Swamp cooler and furnace in the crawl space, 2020 (source: Ratio)

Figure 1-22. Attic access panel, 2020 (source: Ratio)

6-17