2
BUSINESS NEWS AMERICA BREAKS GROUND AT 14,115’ ON NEW PIKES PEAK SUMMIT COMPLEX A symbolic, controlled blast on the 14,115 foot summit of Pikes Peak – America’s Mountain this week signaled the start of three years of construction of a new $50 million, 38,000 square foot Pikes Peak Summit Complex. The complex is anticipated to be complete by the fall of 2020, weather dependent. RTA Architects of Colorado Springs and GWWO Architects of Baltimore, a nationally- recognized expert in designing national park visitor centers, partnered on the design, which will achieve LEED Silver certification, a globally recognized symbol of sustainability achievement, and meet the latest ADA standards. Additional design input was submitted by hundreds of Colorado Springs residents from 2015-2017. The design also strives to achieve “The Living Building Challenge,” a two-year certification process, as a highly sustainable, zero-energy building. Sustainable design aspects include: energy, materials, resilience, site ecology, site water, and water and wastewater. Currently, no other federal buildings are LBC certified. The project includes a new U.S. Army High- Altitude Research Laboratory and a new Summit Visitor Center. The existing Summit House, constructed in 1963, remains fully operational to the more than 600,000 visitors a year throughout the construction process. “As a lifelong resident of Colorado Springs, and as its proud mayor, I can’t express enough how excited I am about this project,” said Colorado Springs Mayor John Suthers. “I am particularly proud of the collaboration between the major stakeholders to get this project underway. I am confident the new Pikes Peak Summit Complex will provide a worthy crown for the popular destination, inspiring visitors from all corners of the world
Take your advice from Mark Zweig to-go.
and of all ages and abilities for generations to come.” The project is a collaboration between the U.S. Forest Service, National Park Service, State Historic Preservation Office, tribal representatives, and the summit’s five major permit holders: City of Colorado Springs, Pikes Peak – America’s Mountain, The Broadmoor’s Pikes Peak Cog Railway, U.S. Army High- Altitude Research Laboratory, and Colorado Springs Utilities. The new Summit Visitor Center, being constructed by contractor GE Johnson, will offer sweeping views and feature digitally interactive displays focused on the history, significance and geology of Pikes Peak. Interpretive outdoor exhibits will also be built along the accessible, elevated pathway, designed to help protect the summit’s fragile tundra. Other upgrades include an improved kitchen, dining facilities, retail space and expanded restroom facilities. The estimated $50 million project is funded in part by reserves from Pikes Peak – America’s Mountain, an enterprise of the city that generates revenue through toll fees and concession sales; revenue bonds taken by Pikes Peak; and public and private donations. Since 1975, RTA Architects has created award- winning architectural and interior designs for the Colorado built environment. They specialize in healthcare, education, retail, and commercial properties, delivering beautiful buildings that serve the unique needs of their owners and occupants. GWWO is an architecture firm based in Baltimore specializing in cultural and educational projects with emphasis on quality design that is inspirational and functional.
thezweigletter.com/category/podcast/
1200 North College Ave. Fayetteville, AR 72703 Mark Zweig | Publisher mzweig@zweiggroup.com Richard Massey | Managing Editor rmassey@zweiggroup.com Christina Zweig | Contributing Editor christinaz@zweiggroup.com Sara Parkman | Editor and Designer sparkman@zweiggroup.com Liisa Andreassen | Correspondent landreassen@zweiggroup.com
MARK ZWEIG, from page 1
performance. The sooner people get the information they need, the sooner they can act. This is important! ❚ ❚ Criticism/praise. The experts will tell you that you cannot wait until a once-a-year performance appraisal to give someone positive or negative feedback. It should happen all year long. The closer the feedback occurs to the actual event – be it good or bad – the more valuable that criticism or praise is to the person receiving it. Speed is crucial! ❚ ❚ Billing and collection. The sooner you can get your bills out, the sooner you can col- lect what’s owed. And the sooner you start trying to collect, the sooner you will get your money. And the sooner you get your money, the sooner you can invest it in something that will (hopefully) make you more of it. Simple idea but powerful. ❚ ❚ Delivery of final work product. How about being fast at doing the work so you can thoroughly check it over before turning it over to the client? How about being early to complete your work so your client has more time to build it? Not to mention the fact that being fast to deliver will enhance your reputation and get you even more work. Speed is important to your success! MARK ZWEIG is Zweig Group’s chairman and founder. Contact him at mzweig@zweiggroup.com.
Tel: 800-466-6275 Fax: 800-842-1560
Email: info@zweiggroup.com Online: thezweigletter.com Twitter: twitter.com/zweigletter Facebook: facebook.com/thezweigletter Published continuously since 1992 by Zweig Group, Fayetteville, Arkansas, USA. ISSN 1068-1310. Issued weekly (48 issues/year) $250 for one-year print subscription; free electronic subscription at thezweigletter.com/subscribe Article reprints: For high-quality reprints, including Eprints and NXTprints, please contact The YGS Group at 717-399- 1900, ext. 139, or email TheZweigLetter@ TheYGSGroup.com. © Copyright 2018, Zweig Group. All rights reserved.
© Copyright 2018. Zweig Group. All rights reserved.
THE ZWEIG LETTER June 25, 2018, ISSUE 1254
Made with FlippingBook Annual report