INSTALLING ALUMINUM GATE/ CONTINUED TREX ALUMINUM
9
8
9. A ttach shorter side of hinge to the gate using
appropriate hinge hardware as listed in chart.
1
1
1
1
2
10
2
8. U sing a 9/64" drill bit, pre-drill at location for attachment of railing to bracket. Secure posts to panel with four 5/8" long self-tapping screws (provided) in each location. Installing Hinges NOTES: » B oth wood and aluminum screws are included in hard- ware kit. (Refer to chart below.) » If using Trex Post Mounts with Post Sleeves, pre-drilling is required using 1/8" (3 mm) drill bit, as you must go through both aluminum sleeve and internal post. » R efer to instructions included in hardware package. Be sure to use correct fasteners for aluminum. See chart below.
4" max (102 mm)
10. P lace gate in opening on blocks. Sweep between bottom of gate and top of deck cannot exceed 4" (102 mm) per IRC/IBC code regulations. Ensure bottom gate posts will be high enough to clear skirts on bottom of deck posts. 11. M ake sure posts are plumb and gate is level. Attach 11 1
longer side of hinges to post using appropriate hardware for type of post installed. Install hinge cover. 12. A fter determining location and height of hinge and hasp, install per instructions included with hardware kit. 13. Ensure proper operation of gate. Hinge tension is adjustable ( check hardware kit instructions for more detail ). 14. After gate installation, place blocks under gate for support. Use a rubber mallet to install cap onto gate post. Repeat for other gate post cap. Snap all hinge covers into place.
MINIMUM FASTENER SIZE - HINGE ATTACHMENT
SCREWS
Type
Length
No.
Wood Screw
2-1/2 " (64 mm)
#9
14
Metal Screw
2 " (51 mm)
#8-18
NOTE: Use of non-Trex hardware is not recommended and could result in serious injury or death.
2
Have Questions? 1–800–BUY–TREX
NOTE: Construction methods are always improving. Please ensure you have the most up-to-date installation instructions by visiting: trex.com
TAG-0623
Made with FlippingBook Digital Proposal Creator