Tandem Group - Portfoilo 2

Honda of Canada Manufacturing (HCM)

HCM Alliston, Ontario

Total area: 4 million sq. ft.

Honda began production in Alliston in November 1986, marking Honda’s first manufacturing investment in Canada. Over time, the site expanded to include three main plants–two for vehicle assembly and a third for four cylinder en - gine production.

Scope of Work

Structural scope included significant steel support: connections for utilities and overhead infrastructure, and all asso - ciated detailing and erection. Load analysis and steel connection study, This engineering ensured the building could support vehicle conveyors, inspection lighting, robotics, and environmental control systems core to Honda’s expand - ed assembly process.

82

Made with FlippingBook. PDF to flipbook with ease