PLATINUM PLUS
Other Home Inclusions
Other Builder 1
Other Builder 2
LUXE
Tender Period
12 months tender period from date of deposit
Lifestyle Studio
Three dedicated days to carefully select the colours and finishes for your dream home, ensuring every decision is made with confidence and ease
Construction Insurance Maintenance Period
Construction insurance premium (home owners warranty)
90 day maintenance period
Pest Control
Pest control certification
Lighting
Light points including compact fluorescent globe
Smoke Detectors Hot Water System Electrical Safety
Smoke detectors provided (direct wired with battery backup)
Electric hot water system
Earth leakage electrical safety switch in single phase meter box
Electrical
2 x TV and 2 x Cat 6 data points
BASIX assessment to State Government requirements 7 Star BASIX requirements
BASIX Assessment
Basic scaffolding, void scaffolding and first floor protection, railing and roof scaffolding as per WH&S requirements, subject to site conditions 10.7 certificate Waste Management Plan Erosion and Sediment Control plan Neighbour Notification plan
Mandatory Site Works
Structural engineering certificate for concrete slab Site contour survey and plan and identification survey Soil test by engineer All weather access control point (standard allowance) Sediment control fencing as required by council Long service levy Trade waste compound as required by council
The ‘Platinum Plus’ promotion is available from 17 th July 2025. This promotion is available with any Clarendon Luxe specification home and is based on standard floor plans. Prices are subject to, Bore Hole, Contour, Bushfire, RTA, Hydraulic Engineers or other Statutory reports as required by your 10.7 certificate, 88B or Site Manager. Up to 8m allowed to the relevant connection point with the exception of The Bowral and Maitland designs which have 25m allowed. 5 Luxe Range | Clarendon Homes
Call 13 63 93 | Clarendon.com.au
Made with FlippingBook Publishing Software