PRELIMINARY SUBDIVISION DESIGN
SUBDIVISION SITE I 28-HOME SUBDIVISION PROJECT
SITE INFORMATION • Subdivision Area: 6.6 Hactares
•Location: Nuuautin IR 2B
• Access: Located east of Highway 1,
and accessed via Alkali Road
WORK COMPLETED
• Environmental Assessment Report
•Geotechnical Report
• Survey Drawings
• DAR Report (Funding request for
design stage)
• Land Encumberance Check
ALKALI ROAD ACCESS I 28-HOME SUBDIVISION PROJECT
ALKALI ROAD ACCESS I 28-HOME SUBDIVISION PROJECT
• Preliminary Subdivision Design
Subdivision Site
NEXT STEPS
•Septic Design and Report
Alkali Road will receive a full upgrade to align with the Ministry of Transportation and Infrastructure standards.
•Detailed Subdivision Design
• PAR Report (funding request for
Grading to accommodate the new Alkali Road upgrade.
construction stage)
• Cost Estimate
Alkali Road Access
•Civil Construction Drawings
• Water Servicing and Infrastructure
Design; Electrical Infrastructure Design
LYTTON FIRST NATION 28-HOME SUBDIVISION WWW.APLINMARTIN.COM/LFNSUBDIVISION OPENHOUSE@APLINMARTIN.COM