OUR REQUEST

Two steps must be fulfilled to secure the contract, commencing from the outset and continuing through to completion. Step 1: ✓ Our project's standout feature is creating a green power plant that operates 24/7, representing a significant advancement in the energy industry. ✓ We plan to store surplus energy from existing power plants, such as solar, hydro dams, and diesel generator sets, and convert it into air and water storage. Step 2: ✓ We intend to utilize the stored energy to produce hydrogen using KOH in a cell structure designed specifically for hydrogen production. ✓ This process aims to maximize energy efficiency. Additionally, we are planning to store the resulting hydrogen in two forms: gas and liquid.