Castle Mountain Pad 1A Construction & Contract Mining California
• 160 AC of Clearing & Stripping • 208,000 CY of Topsoil Removed • 767,942 CY of General Excavation & Embankment • 200,070 CY of Leak Detection Gravel Loaded/Hauled/Placed • 208,637 CY of Overliner Gravel Loaded/Hauled/Placed
• 19,880 LF 18” HDPE Pipe Installed • 594 LF 20” HDPE SDR Pipe Installed • 13,359,660 SF Liner • 17,837,185 CY of Ore & Waste
• 13,360 LF of 2” HDPE Pipe Installed • 18,570 LF 4” HDPE Pipe Installed