Workforce planning
Medium scenario forecasts 550k FTE needed for 2025 construction, 730k FTE needed by 2030. Workforce demand increases alongside the uptick of solar capacity addition. Scenario
Medium
Commercial and Industrial
Utility
Row Labels
AC cabling interconnection
48
24
36
Electrical Test
Grid Connection
132
Inspection and Repair
86,4
114
Monitor and Routing Task
3,6
9,6
Mounting Rails
216
840
Panel Installation
758,4
Piling and Rafting
126
Site Preparation
132
Grand Total
1377,6
1148,4
As a rule of thumb, 1 GW of module production capacity can generate anywhere from 1056 to 1584 direct jobs.