GWOForum2025

Workforce planning

Medium scenario forecasts 550k FTE needed for 2025 construction, 730k FTE needed by 2030. Workforce demand increases alongside the uptick of solar capacity addition. Scenario

Medium

Commercial and Industrial

Utility

Row Labels

AC cabling interconnection

48

24

36

Electrical Test

Grid Connection

132

Inspection and Repair

86,4

114

Monitor and Routing Task

3,6

9,6

Mounting Rails

216

840

Panel Installation

758,4

Piling and Rafting

126

Site Preparation

132

Grand Total

1377,6

1148,4

As a rule of thumb, 1 GW of module production capacity can generate anywhere from 1056 to 1584 direct jobs.