TRAFFIC IMPROVEMENT CONCEPT
PULLOUT LANE: A 3m wide pullout lane along the north side of 24 Avenue from 134 St to 136 St, approximately 360 meters long, is proposed. This pullout lane aims to facilitate convenient drop-off for students and improve traffic flow for those accessing the school from the east direction. PEDESTRIAN CROSSWALK: A pedestrian crosswalk connecting the pullout lane and the sidewalk of future 135 St to the school on 24 Avenue is planned to enhance pedestrian connectivity and safety. BIKE LANES AND SIDEWALKS: The proposal includes 1.8m wide bike lanes and 1.8m wide sidewalks on both sides of 24 Avenue, promoting active transportation and pedestrian accessibility. PARKING POCKETS: Two parking pockets are proposed along both sides of the future 135 St, connecting 24 Avenue and future 24A Avenue. These parking pockets will facilitate drop-off for students during school hours and provide parking options for the public visiting the north park area during regular hours. SIDEWALKS ON FUTURE 135 ST: 1.5m wide sidewalks on both sides of the future 135 St, connecting 24 Avenue and 24A Avenue, are included in the plan.
1
2
3
4
5
CRESCENT OAK ESTATES
|
RESIDENTIAL DEVELOPMENT
Made with FlippingBook Annual report maker