CASE STUDY
ASPENSTUDENTACCOMMODATION, DUBLIN
PLANT ROOM AND DISTRIBUTION CENTRE
P aul Devlin Mechanical Services prefabricated and installed two plant rooms and distribution centre to the Aspen Student Accommodation site for Gaffney Mechanical Services. The County Down firm collaborated with NI Mechanical to create the 3D modelling and setting out of the distribution centre. Once the drawings were approved Paul Devlin Mechanical Services prefabricated the structures in their own warehouse facility before transporting and installing onsite. Prefabricating plant rooms offsite has many advantages, says Paul Devlin, Managing Director at Paul Devlin Mechanical Services. “Our warehouse is properly set up for the prefabrication process so there is better materials organisation and work is completed to a higher manufactured finish. More than 70% of these types of projects can be done offsite in a more organised environment. Having the right facilities and proper
PAUL DEVLIN MECHAN I CAL SERV I CES
equipment in place creates a much safer prefabrication process for my team.” Paul Devlin Mechanical Services have worked with Gaffney Mechanical Services on a number of previous large-scale projects, including Citywest.
T: +44 (0)7540 767889 E: pauljames.devlin@gmail.com
DISTRICT HEATING SYSTEM
H eatec Mechanical Services installed the low-pressure hot water district heating system and domestic water services to the 362-bed student accommodation at the landmark Aspen Student Accommodation development. The mixed-use scheme, located just off Ballymun main street, within a mile of Dublin City University, encompasses a separate Lidl store, customer car park, with additional office space as well as two linked blocks of retail and student accommodation. Heatec Mechanical Services’ installation included water services in the clusters to the bedroom ensuites and the heating systems to all bedrooms. Joe Whelan, Owner at Heatec Mechnical Services says, “We completed all the final connections to the pods, kitchen sinks and the heat interface units – all the installation and testing work. Joe spoke highly of the mechanical contractor. “We’ve worked with Gaffneys
“We completed all the final connections to the pods, kitchen sinks and the heat interface units.”
for a number of years now, and as always they were extremely well-organised and very productive on-site. The bulk of our work is large-scale apartment developments and commercial jobs, mostly in the Leinster region.”
T: +353 (0)86 391 7669 E: info@heatec.ie