FPA RICSA BRET PARAMETER
OUTCOME
1
Building Use and Occupancy
Commercial
2
Building Height and Storeys
10 storeys, <30m
3
Building Footprint
>30,000 m 2 /<50,000 m 2
M 2
4
Size of Compartment (% Area)
%
Single floor, <15% of total area
5
Size of Compartment (% Volume)
<15% total volume
%
6
Structural Material
Hybrid (CLT & steel/concrete)
7
Ground Floor Structure
Concrete
8
Construction Method
Offsite Category 3 and 5
9
Core Structure
Steel or concrete
10
Floor Structure
CLT
11
Façade System
Non-combustible, fire spread prevention between floors
12
Interior Surfaces
CLT + steel/concrete
13
Atria
None
14
Internal Car Parking
None
15
Balconies
None
16
Swimming Pool/Spa/Sauna
None
17
Hazardous Materials
None
18
Eco Surfaces
None
19
Renewable Energy Systems
PV panels installed to roof
20
Combustible Void Protection
Dry lined with sprinkler protection and fire detection
21
Detection/Suppression
Early detection system and sprinkler system
22
Separation
> 6m from relevant boundary
23
Firefighter Provisions
Dry risers provided
24
Stairwells
2 no. stairwells
25
Flood Risk and Resilience
Non timber roof. Considered a low flood risk zone.
26
EOW Risk and Resilience
Plumbed services and service risers all within concrete core
Example Buildings
9 1
Made with FlippingBook - professional solution for displaying marketing and sales documents online