SMW-AUTOBLOK EN

AC-BB

■ Pneumatic diagram ■ Wiring diagram Pneumatic diagram AC-BB Size of all pneumatic lines min. 1/2“ or 3/4“

Control unit for SP and Big Bore chucks

Clamping chuck

G1/2“

G1/2“

Air flow sensor

Air flow sensor

B1 B2

M1

DR1

10 bar

Pressure reducing valve

SD1

SD2

SV1

SV2

Pressure converter 10 bar (Optional)

Y1

Y2

Y1

Y2

B3

Pneumatic power supply air connection max. pressure 10 bar

Valve

Valve

Y1

Y2

Wiring diagram AC-BB

Constant power

24 V DC 110 V AC 230 V AC

Voltage at stopped spindle only

24 V DC 110 V AC 230 V AC

A1 Seikom 24VDC 110VAC 230VAC

Finder relais K1 and K2

A2 Seikom 24VDC 110VAC 230VAC

44 34 24 14

L1 N

L1 N

PE

11 .6 14

K2

1 2

11 .4 14

K1

B3

42 32 22 12

Pressure switch 1 - 10 bar

A2

A1

Foot pedal or push button (not included in standard supply range)

Orange Green

9

Orange Green

41 31 21 11

K1

K2

K2

21 .4 22

1 2 3 4

31 .4 34

31 .6 34

K1

1 2 3 4

21 .6 22

S1

18 16

21 K3 K4

18 16

21 K5 K6

24

15

24

15

S2

24 21

15 16 18

a2 b2 a3

24 21

15 16 18

a2 b2 a3

PE

1 2

PE

BN GY BK

BN GY BK

B2 Seikom

B1 Seikom

Y1 1 2

A1 A2

A1 A2

PE

K1

K2

PE

PE

GND

Period of impulse for clamping / unclamping 1 s

11 21 31

14.4 22.6 34.1

11 21 31

14.6 22.4 34.9

SMW-AUTOBLOK 389

Made with FlippingBook Publishing Software