29 Station Road, Backwell PROFESSIONAL PLANNING APPRAISAL
Application Report/Survey Requirements
5.13 This is likely to include:
A drainage scheme (Sustainable Urban Drainage);
An Energy Strategy demonstrating that the scheme would deliver 10% of the predicted energy use through renewable energy sources; A tree survey, arboricultural implications assessment, method statement, and tree protection plan; Ecological Surveys (a Phase 1 survey and potentially protected species surveys – these would need to be undertaken between May and September);
Coal Mining Risk Assessment.
6. SKETCH BLOCK PLAN
TO FOLLOW
7 | P a g e
Made with FlippingBook - professional solution for displaying marketing and sales documents online