Ardmac
& Office laboratories
OUR GUIDING PRINCIPLES AND CORE VALUES
Our vision is to be the contractor of choice for clients and the workplace of choice for great people .
Safety First Understand Our Customers Respect Always Excellence As A Standard Deliver Our Brand Promise
2
3
ARDMAC IN NUMBERS
SECTORS
44
23
Years in business
Years in the UK
Cat A, B and C fit-out and refurbishment
341
60
People working at Ardmac
People employed over 10 years
750 5000+
Laboratories and cleanrooms and complex environments
Projects completed in the past 5 years
Total projects completed
6 Consecutive RoSPA Order of Distinction Awards
Consecutive RoSPA Gold Health and Safety Awards 21
Universities
2020 Group Turnover £180m
2021 APC UK Turnover £45m
Established in 1977
4
5
CORPORATE SOCIAL RESPONSIBILITY
HEALTH AND SAFETY 7 million hours RIDDOR free. 21 consecutive years of ROSPA Gold awards, 6 years with an Order of Distinction. Management Systems - ISO 14001, ISO 45001 and ISO 9001, commencing ISO 50001 in 2020. 5 mental health first aiders in the UK and an ongoing partnership with Manchester Mind.
Promote and protect individual safety and health
Provide employment, education and training
Manchester: T: +44 (0) 161 866 8086 Dublin: T: +353 (0) 1 894 8800 Craigavon: T: +44 (0) 28 3834 7093 Brussels: T: +32 (0) 10 229 705 www.ardmac.com
Minimise impact on the world’s natural resources
Hours RIDDOR free 7m
MHFA Champion
Reduce emissions and eliminate plastics across our business
MHFA England
Create a positive impact on communities
Our partnerships:
6
7
SENIOR LEADERSHIP TEAM
Contents
PHILIP CHADWICK Managing Director_ Operations
Andrew Winstanley Managing Director_ Pre Contract
Cat B and C
11
Cat A and refurbishment of Landlord’s buildings Laboratories with complex environments Live Cleanroom Projects
27
Stephen Jones Associate Commercial Director
John Prendergast Regional Director
41
53
Gavin King (CMIOSH) SHEQ Manager
8
9
Ardmac has recently won numerous Cat A, Cat B and laboratory projects. Recently won projects A, Cat B and laborat ry projects.
10
11
UNILEVER, CROSSROADS, PORT SUNLIGHT, WIRRAL
CRODA, GOOLE PHASE 1
CLIENT: PM/QS: DESIGN:
Unilever Arcadis
M&E:
Hoare Lea
CLIENT: QS/PD: DESIGN:
Croda Europe Limited Jones Hargreaves Be Inspired Interiors Ltd
PROGRAMME:
Live
PROGRAMME:
Live
VALUE:
£1.5M
DLA
VALUE:
£9.5M
CONTRACT:
JCT D&B
STRUCTURAL:
Curtins
CONTRACT:
JCT D&B
MEP:
Hydrock MRB
Ardmac has recently been appointed under a JCT D&B contract by Unilever UK to undertake the full refurbishment and extension of their Research and Development Facility at Port Sunlight. The works include a new build entrance reception, formation of a glazed ‘Quad’ to house a restaurant and hub, new laboratory area with specialist gases (housing a
central research facility) and a new customer appraisal and product testing area. Arcadis is leading Unilever’s estate rationalisation and are acting in the capacity of PM and cost consultants. DLA architecture and Curtins structural engineering have been novated over to Ardmac and the works will take place over 36 weeks whilst the facility remains in
operation with live services and site wide traffic movement . As part of the tender process Ardmac has worked closely with the client to understand their operational needs and develop the design with value engineering whilst maintaining all the technical requirements and architectural design intent.
The project is to take the Cat A status of ‘Offices 1 and 2’ and deliver a ‘turnkey’ Cat B solution to enable occupation by Croda immediately following completion. The intent is to create a high specification office environment for staff and visitors which aligns with the Croda’s values.
Office 1 is the main reception and office facility and will include a staff canteen/breakout space and meeting/training facility on the ground floor with offices and meeting spaces on the upper floors. Office 2 will house a sampling and re-packing area on the ground floor together with driver’s reception
and welfare facilities. Office accommodation is to be located on the first floor together with a fallow area.
12
13
8 PARK ROW, LEEDS
DELTA HOUSE, GLASGOW
CLIENT: PM/PD: DESIGN:
Schroeders
PROGRAMME:
Live
CLIENT: PM/PD: DESIGN:
Threadneedle Pensions Limited
STRUCTURAL: PROGRAMME:
WSP Live £4M
MHBC
VALUE:
£2.5M
Workman LLP
Corstorphine & Wright
CONTRACT:
JCT Intermediate
TP Bennett
VALUE:
MEP:
MHBC
MEP:
Crookes Walker Consulting
CONTRACT:
JCT D&B
Ardmac has successfully delivered two other projects for Shroeders and MHBC at City Square in Manchester and through a negotiated process has been appointed under a JCT intermediate contract to undertake the Cat A+
refurbishment of Delta House in Glasgow whilst existing tenants are still incumbent in the building.
the installation of a fitness suite, bike stores, showers and changing to the basement area.
Ardmac has been appointed by Threadneedle under a JCT intermediate form of contract, with contractor design portions, to carry out the fit-out of TP Bennett’s design to fully refurbish to a Cat A+ status the seven-storey building in Leeds.
The works include the strip-out of the building, installation of all new MEP systems designed by Crookes Walker, fit- out of Floors 2 to 7 to a Cat A status and to completely refurbish the reception which will include a Cat B and C breakout area/ business lounge including cellular offices
and meeting pods. A new fitness suite, bike storage, shower rooms and changing rooms will be installed in the basement. Workplace LLP are acting as the PM and cost consultants.
This project consists of all new MEP and the complete
refurbishment of the reception, the Cat A fit-out of Floors 9, 8, 6, 5 and
LINLEY HOUSE PHASE 2, MANCHESTER
CLIENT:
Castleforge Partners LLP
STRUCTURAL: PROGRAMME:
London Structures Lab
PM: QS:
Rise
Live £4M
Soben Contract & Commercial
VALUE:
DESIGN:
Morey Smith
CONTRACT:
JCT D&B
MEP:
LSD
Ardmac has successfully delivered two other projects for Castleforge in the Grade I listed building, Edward Pavillion, Albert Dock and at 81 Fountain Street, Manchester. Ardmac has been appointed under a JCT D&B contract to undertake the Cat A, B and C refurbishment of Linley House whilst existing tenants are still incumbent in the building.
Ardmac has employed Fairhurst design to complete the Morley Smith concepts to RIBA Stage 5 with Lehding Services Design (M&E) remaining on the client side. All new MEP services will be installed in a live environment and the fit-out works will include a new reception area, a high specification business lounge, café area and flexible cellular office solution.
Façade alterations to be undertaken to the ground and first floors to suit the new layouts. Structural alterations will include replacing the existing curtain walling to the ground and second floors and to create a new aperture for the introduction of a new staircase between Floors 1 and 2 linking the business lounge to the flexible working space.
14
15
Cat B and C Ardmac is a specialist in providing high- quality Cat B and C fit-out projects for numerous FTSE 100 companies in the commercial, legal, manufacturing and financial services sector.
16
17
ROYAL LONDON, ALDERLEY PARK
Client: Royal London Group Size: 100,000ft 2
Programme: 26 weeks
18
19
It looks absolutely fantastic. You and the team must be rightly proud.
ZENITH, KIRKSTALL FORGE, LEEDS
Shorlisted 2018
Space Invader Design
Client: Zenith
Size: 77,164ft 2
Programme: 18 weeks
20
21
HANA, WINDMILL GREEN, MANCHESTER
Client: Hana
Size: 25,000ft 2
Programme: 12 weeks
22
23
WINNER of the Mixology ‘Commercial Interiors Project of the Year’ (Over 30kft 2 ) Award 2019
CASTLEFORGE - ON BEHALF OF CLOCKWISE
Client: Castleforge
Size: 70,000ft 2
Programme: 21 weeks
24
25
Shortlisted 2019
BAUHAUS, QUAY STREET MANCHESTER
Client: Orchard Street
Size: 50,000ft 2
Programme: 44 weeks
26
27
Ardmac successfully completed the third-floor office fit-out of our Castleford food production plant to a high quality. The team worked in a thoroughly professional and proactive manner to ensure delivery of the project without incident. We are delighted with our new facilities and would have no hesitation in recommending the service of Ardmac to other organisations.
HARIBO, CASTLEFORD
Haribo UK Operations
Client: Haribo UK Dunhills (Pentefract) Plc
Size: 753ft 2
Programme: 19 weeks
28
29
Really happy to have concluded a fantastic project for Bupa. An office fit-out in Leeds at Kirkstall Forge a CEG development. I’ve worked with a great fit-out team, Including Ardmac, Sheppard Robson, Virtus Consult and Hoare Lea. We developed fantastic collaboration, included great innovation and the teamwork was second to none.
Chris Lawrence, Three Thirty Four
BUPA, KIRKSTALL FORGE, LEEDS
Client: Bupa
Size: 28,000ft 2
Programme: 15 weeks
30
31
Cat A and refurbishment of Landlord’s buildings
32
33
Shorlisted 2019
On this challenging redevelopment project, it was mission critical that we could rely on a contractor that would pro-actively lead and deliver our challenging project to a superior standard. During tender process we were impressed with Ardmac’s professionalism and attention to detail throughout the whole process and preparation of the construction site and proposed works. We have been consistently impressed with the proactive nature of the Ardmac project team, quality of the construction and the delivery of the design team’s vision, to be critically on time and on budget.
101 BARBIROLLI SQUARE, MANCHESTER
Client: AEW Europe
Size: 85,000ft 2
Programme: 52 weeks
Director - AEW Europe
34
35
NOVEMBER 2020
MARCH 2020
100 BARBIROLLI SQUARE, MANCHESTER
Client: AEW Europe
Size: 150,000ft 2
Programme: On-site
36
37
ONE CITY SQUARE, LEEDS
Client: APAM
Size: 50,000ft 2
Programme: Live
38
39
Winner of the Refurbishment of the Year Award
SUNLIGHT HOUSE
Client: Aberdeen Asset Management
Size: 17,000ft 2
Programme: 52 weeks
40
41
ANCHORAGE, BUILDING 2, ANCHORAGE QUAY SALFORD
Client: HIG Salford Property & Canmoor Asset Management Size: 15,000ft 2
Programme: 26 weeks
42
43
BRIDGEWATER HOUSE, MANCHESTER
Client: APAM
Size: 5,000ft 2
Programme: 15 weeks
44
45
Laboratories with complex environments
46
47
With the fit-out playing a key part in the development and growth of MDC, it was essential a collaboratve and sensitive approach was adopted by all members of the project team. Ardmac played an integral part; not only in delivery but in understanding the client’s needs and requirements. The teams approach to cost control, collaboration and delivery whilst developing key relationships with both Client and Landlord Stakeholders proved invaluable. A point of reference is the company’s approach to port completion activities, the client has benefitted from a proactive approach to The Soft Landings Process contributing to a successful transition from handover to user occupation. We would not hesitate in recommending Ardmac Performance Contracting for future schemes.
David I Hillier, Property Project Manager
MEDICINES DISCOVERY, CATAPULT ALDERLEY PARK - PHASE 1
Client: Medicines Discovery Catapult
Size: 6,458ft 2
Programme: 14 weeks
48
49
MEDICINES DISCOVERY, CATAPULT ALDERLEY PARK - PHASE 2
Client: Medicines Discovery Catapult
Size: 8,000ft 2
Programme: 20 weeks
50
51
NEW RAPID RESPONSE LABORATORY, SALFORD
Client: The Doctors Laboratory Size: 30,000ft 2
Programme: 15 weeks
52
53
BUPA, MARBLE STREET, MANCHESTER
Client: Bupa Insurance Ltd
Size: 2,150ft 2
Programme: 10 weeks
54
55
IVI CARE FERTILITY CLINIC, LIVERPOOL
Client: Care Fertility Size: 2,150ft 2
Programme: 14 weeks
56
57
Live Cleanroom Projects
58
59
SEQURIUS CLASS C - ISO 5 - 8 cleanroom (across 6 projects)
Client: Sequirus
Programme: Live
These images are taken from completed pharmaceutical projects undertaken by Ardmac.
60
61
UNIVERSITY OF CARDIFF - ISO 5 cleanroom for microelectronics
Client: University of Cardiff
Value: £5m
Programme: Live
These images are taken from completed microelectronics projects undertaken by Ardmac.
62
63
SWANSEA UNIVERSITY - ISO 5 cleanroom for microelectronics (currently under construction)
Client: Swansea University
Value: £3m
Programme: Live
These images are taken from completed microelectronics projects undertaken by Ardmac.
64
65
UNILEVER (5 cleanrooms projects of various specifications to date)
Client: Unilever
Programme: Live
These images are taken from completed cleanrooms projects undertaken by Ardmac.
66
67
Ardmac Performance Contracting 4 Scholar Green Road, Cobra Court, Trafford, Manchester, M32 0TR. Phone: +44 (0) 161 866 8086 Email: info@ardmac.com
68
Page 1 Page 2-3 Page 4-5 Page 6-7 Page 8-9 Page 10-11 Page 12-13 Page 14-15 Page 16-17 Page 18-19 Page 20-21 Page 22-23 Page 24-25 Page 26-27 Page 28-29 Page 30-31 Page 32-33 Page 34-35 Page 36-37 Page 38-39 Page 40-41 Page 42-43 Page 44-45 Page 46-47 Page 48-49 Page 50-51 Page 52-53 Page 54-55 Page 56-57 Page 58-59 Page 60-61 Page 62-63 Page 64-65 Page 66-67 Page 68Made with FlippingBook - professional solution for displaying marketing and sales documents online