INFRASTRUCTURE COLLABORATING FOR COMPLEX RAIL INFRASTRUCTURE PROJECTS
Our experience covers every aspect of rail infrastructure, allowing us to create economic and social value at every part of the lifecycle, from design to delivery to decommissioning.
Severn Tunnel Track Renewal Click the link to view the full case study. Cambridge South Station Click the link to view the full case study.
16 Day Blockade A renewal of this scale at Severn Tunnel has not been attempted before.
1.7km twin track route.
5.7km of new rail installed.
£760,516 generated in social value.
Old Oak Common HS2 Station Click the link to view
98% of materials diverted away from landfill.
£2.5m in savings by efficient project planning.
the full case study. Cornwall Level Crossing
Collaboration with original equipment manufacturers to create bespoke barrier machines.
4 Level Crossings upgraded to sophisticated signalling systems.
Upgrades Click the link to view the full case study.
17
Made with FlippingBook - professional solution for displaying marketing and sales documents online