ECS-Naperville Embassy Suites PROJECT STUDY

Hilton ®

Embassy Suites Hotel

Naperville, Illinois Completed Q1 2015

• Structural Insulated Sheathing building system installation • 168 Suite 7-story hotel with convention center • Factory Construction Prefabricated • Prefinished wall system panels • Wall panel installation 9/27/14 – 12/05/14

ROK-ON, Naperville Hotel Presentation Document ID: NH08R0517

Made with FlippingBook Online document