growing now client: Bruntwood SciTech, Greenheys Manchester Science Park Planning: Initially refused - UGF and BNG Issues Contributed Brief: IWP - HYVERT to propose a UGF and BNG solution which could be adapted to fit within the original design concepts of the building with minimal change to the core structure. . Solution: Installation of 1600 sqrm living wall, further 300 square meter living wall will also go inside.
Made with FlippingBook - Online magazine maker