BAKERS OF NAILSEA ABATTOIR PROFESSIONAL PLANNING APPRAISAL
▪ Ecological Surveys (a Phase 1 survey and potentially protected species
surveys – these would need to be undertaken between May and
September);
▪
Indicative Lighting Strategy;
▪ A desk-based archaeological assessment (although the existing building and
hard-standing is likely to have impacted on any surviving archaeological
deposits);
▪
A Transport Statement;
▪ Potentially a Coal Mining Risk Assessment;
▪ A Flood Risk Assessment should there be evidence of local flooding/drainage
issues.
6. SKETCH BLOCK PLAN
10 | P a g e
Made with FlippingBook - professional solution for displaying marketing and sales documents online