New Depths of Data Center Efficiency with Immersion Cooling

8

Customer Success Stories: Viridian Energy

Industry: Energy Sector - Seismic Processing Location: Houston, TX Infrastructure: 4MW Data Center

The Solution Veridien adopted GRC's immersion cooling technology, deploying approximately 100 racks of Nvidia GPU-based servers into GRC's systems. This solution was seamlessly integrated into their existing datacenter, utilizing the raised floor and connecting to their chilled water loop. Each rack was designed to efficiently cool 40 kW of IT load.

The Challenge Veridien faced significant power constraints with their traditional air-cooled solution. The energy- intensive cooling was limiting their operational capacity and preventing efficient expansion. They urgently needed a more energy-efficient cooling method to overcome these limitations and maximize their IT infrastructure's potential.

Measurable Results

Reduction in cooling energy compared to previous air-cooled systems

Increased compute capacity within the same power footprint

90%

Capacity

15 years of successful operation, demonstrating remarkable longevity and reliability, while extending operational life of data center by reallocating power from cooling to IT loads Extending operational life of data center