MBA280 Class Projects Flipbook Spring '25

Sustainability Building Systems

Built with cross-laminated timber (CLT) and designed for net-zero readiness, this project cuts embodied carbon by up to 60% compared to steel or concrete. Leveraging C-PACE financing, we turn sustainability into a value driver—lowering operating costs, boosting tenant appeal, and future- proofing the asset in a carbon-constrained world.

Mass Timber Innovation

Healthy, Resilient, and Certified

Cross-Laminated Timber (CLT): Reduces embodied carbon by up to 60%

● Targeting LEED Gold / WELL : Sustainable and wellness-centered operations ● Low-VOC & Non-Toxic Finishes : Supports indoor air quality and occupant health ● Seismic-Resilient CLT Design : Built to withstand Bay Area risk profile

● Carbon Sequestration: Building stores CO ₂ across its lifespan ● Biophilic Design: Natural materials promote wellness and productivity

High-Performance Systems

Transit-Oriented & Climate-Aligned

● All-Electric + Solar-Ready : Fully electrified, future net-zero capable ● Passive Design Strategies : Optimized envelope reduces energy loads ● C-PACE Financed Upgrades : Long-term savings + low-cost capital

● Steps from Major Transit Lines : Reduces car dependence ● EV Charging + Bike Facilities : Supports low- carbon commuting ● Stormwater + Smart Irrigation : Water-efficient and resilient site design

Made with FlippingBook Online newsletter maker