Havwoods The Wood Book - India

Conditions for fitting PurePlank on walls are the same as for floorboards, i.e. 45% to 60% humidity and a temperature of between 18°C and 24°C, and packs should be acclimatised for around 48 hours. The walls to be clad should not deviate from true by more than 2mm over 2 metres. Apply wood or construction glue to the structural timbers to the height of one board. Lay the first board, with the tongue removed, to the glued grid and fix it from above with the clips. Fit the mounting clip into the protruding groove, then screw it to each timber with a wood screw. Connect the subsequent boards together using the locks, knocking them home. Wooden or aluminium angle bars or an aluminium flat bar may be used as a decorative and protective finish on the trimmed edge.

100070 PUREPLANK WALL MOUNTING CLIPS 50 clips per box. (22 clips on average per m2 to install on walls.)

info@havwoods.in | www.havwoods.in | T. 91 (0) 22 24938633

134

Made with FlippingBook HTML5