Project Profile_Point Loma_4-4-19_Draft

PROJECT PROFILE | POINT LOMA, CA Fully Compatible Treatment Train Fits Small Footprint UrbanPond TM & Modular Wetlands®

A Forterra Company

CONTACT INFORMATION Regional Stormwater Consultant for San Diego

Sean Hasan San Diego & Riverside Counties | Phone: (760) 473-1057 | Email: Sean.Hasan@Forterrabp.com

UrbanPond TM

Lighter weight and easier to install.

Can be installed deeper without the need to increase wall thickness or add additional rebar.

Higher void percentages & increased material efficiency for best in class cost per cubic foot storage.

Designed to meet H-20 loading requirements and the square tessellation provides superior strength and load capacity.

Does not require imported rock back-fill in most applications.

A linkUP slab allows elimination of some modules, further decreasing cost and installation time.

With or without plants (open planter or sealed), the system maintains superior performance in any design configuration.

WA TAPE GULD Approval Without Plants

The Modular Wetlands ® System Linear

Piping into the system opens up numerous configuration and design options, like downstream of detention usage or diverting for retrofits. The easily accessible pretreatment chamber traps and isolates trash, sediments, and hydrocarbons. A unique feature, proven to keep maintenance frequencies and costs at industry-leading lows.

Can Accept Existing Pipe Below Surface

Works Months Without Requiring Maintenance

The Side-By-Side Orientation option allows abnormal high flows to bypass from pretreatment directly to the discharge chamber.

Can Accommodate High Flow Internal Bypass

Space-saving design provides low excavation and installation costs, plus there is no dangerous depressed planter or standing water.

Design Flexibility & Safety

Side-by-Side Orientation

5796 Armada Drive #250, Carlsbad, CA | 855.566.3938 | stormwater@forterrabp.com | www.biocleanenvironmental.com

Made with FlippingBook - Online catalogs