Installation Requirements
¼” connection to municipal cold water supply • Supply fitting for ¼” O.D. required; to be provided by installer.
1
• Water supply valve and 6’ cold water feed line included. • VistaCheck Dual Check Backflow Preventer(s) included. • Air gap accessory available separately if required by local code authorities. Drain connection using 1-½” material with trap • 1-½” utility tee with push-in fittings included. • Inline thermal sensor(s) included to ensure wastewater is cool enough to send directly down the drain.
2
1” minimum
Note: Keep entire drain assembly as low as possible while maintaining a minimum of 1” offset from the coolant overflow barb as shown.
Hot
Cold
Tank Positioning The VistaCool system should be set on a hard, level surface and installed so that the top of the water tank is above the coolant overflow fitting on the drain adapter assembly, and below the autoclave outlet. Installing a tank at the wrong height may create resistance for proper water flow, since the system is designed to take advantage of gravity flow.
AUTOCLAVE
Note: Adjustable tank stands for installing the VistaCool at the correct height are available as accessories when needed (S7545 for use with single-unit V7501; S7547 for use with double-unit V7502). These stands raise the tank height between ½” and 5” in ½” increments.
Tank Dimensions
V7501 7.6” W x 7.6” L x 13.75” H
V7502 4.0” W x 13.0” L x 17.0” H
17”
13.75”
7.6”
4”
7.6”
13”
SciCan Inc. 701 Technology Dr., Canonsburg, PA 15317 USA Distributed by:
Vista Research Group 1244 Country Road 1475, Ashland, Ohio 44805 USA Manufactured by:
Phone (419) 281-3927 VistaResearchGroup.com
Tel: (724) 820-1600 Toll Free: 1-800-572-1211 Fax: (724) 820-1479
scican.com