RTT Industrial Paint Booths Installation Manual

4.14 Access Door Latch Installation

EXTEND BOLTS THROUGH ENTIRE DOOR & WALL THICKNESS

BOOTH PANELS

TEK SCREW IN PLACE WITH BRACKET LIP ON OUTSIDE OF WALL PANEL FLANGE

ACCESS DOOR

LATCH SUPPORT BRACKET BOLTED INSIDE PANEL FLANGE

P2 LATCH

ACCESS DOOR

LATCH SUPPORT BRACKET BOLTED IN PLACE

P2 LATCH

LATCH SUPPORT BRACKET BOLTED IN PLACE

LATCH SUPPORT BRACKET TEK SCREWED IN PLACE

1. Unbolt two bolts that connect panel and door frame approx. 42" from the floor. 2. Insert door latch bracket into panel flange with the tail laying over the opposite panel flange. 3. Reinsert bolts and tighten. 4. Drill and bolt the P-2 latch striker plate through the door latch bracket and the wall panel. 5. Drill through the door and bolt the P-2 latch to it. 6. Tek screw the tail end of the door latch bracket to the other panel flange.

29

Made with FlippingBook - professional solution for displaying marketing and sales documents online