Process 4 – Roof Assembly
Step 1 - Preparing the insulated panels to be erected a) Insulating the panel channels > Fill the male side of the panel with the 2” strip insulation as well as the top and bottom channel > DO NOT insulate the female channel at this time Step 2 - Installing the Roof Panels - Reference Figure 10 a) Begin the roof installation by placing in the Female – Female panel. See drawing packet for item number. b) Install strip insulation in the female channel that will be mating to the door header. c) Run a 3/8” bead of oven cement on the T-7 angle. d) Set the panel per the drawing packet and fasten into position using the stitch screws provided. e) Follow the same procedures as the oven walls until the roof has been installed per the drawing packet.
NOTE: Some ovens may require the need to have explosion relief areas in the roof of the oven. Fastening the roof panels to the T-7 trim MUST be AVOIDED as the panels need the ability to lift in the event of an explosion.
30
Made with FlippingBook - professional solution for displaying marketing and sales documents online