RTT Ovens Installation & Start Up Manual

Process 5 – Heater Box Installation (Floor Mounted)

Step 1 - Opening for Heater Box a) Make sure that the Female Channels of the heater box opening are insulated with strip insulation. b) Once insulated install the cap channel so that the panels are flashed off and insulated. Fasten ONLY the inside flange with the stitch screws provided. Reference Figure 12. c) Double Check opening dimension to the dimensions of the heater to ensure the heater box will be able to slide into the opening. d) Make any adjustments required so that the opening is larger than the heater box. Step 2 - Installing the Heater Box a) Move the heater box into position so that it can be slid into the opening in the wall panels b) Before sliding into place run a 3/8” bead of cement on the contact side of the mating angle located on the sides of the heater box. Reference Figure 11. c) Slide heater box into opening. Ensure that the oven mating angle makes solid contact over the entire length of the flange. d) Fasten the angle to the to the oven wall using the stitch screws provided. Note: It may be necessary to use the galvanized Tek screws in order to pull the angle tight to the panel wall.

32

Made with FlippingBook - professional solution for displaying marketing and sales documents online