Process 7 – Flashing Walls and Roof
i) Repeat on all corners j) Take a straight piece of corner trim and overlap the corner piece by 1” and fasten the wall side with stitch screws along the chalk line k) Continue with more straight trim until you have reached the next corner, it will be necessary to cut the last trim piece to fit with the 1” required overlap. l) Once all trim is fastened to the walls take a level on the horizontal flange of the corner trim and level as it is fastened to the roof panels. m) Repeat around entire oven. n) If the oven uses a Floor Mounted Heater box a flat piece of trim is used (see drawing packet for details) over the top of the heater box and oven roof. Reference Figure 12.
39
Made with FlippingBook - professional solution for displaying marketing and sales documents online