Process 9 - Product Door Opening Support Structure Assembly
Step 1 - Prior to mounting the doors the door opening support structure must be installed . a) Locate the channel members required – Reference the Drawing Packet . b) Using the Drawing Packet locate the channels in the correct location .
Step 2 - Securing the structure to the oven– Reference Figure 21 a) Fasten the channels to the insulated panels by using the stitch screws provided with the oven . b) Once all channels have been fastened to the panels the butted connections must be field welded to complete the connects . c) Any anchor plates will also need to be anchored to the floor .
48
Made with FlippingBook - professional solution for displaying marketing and sales documents online