RTT Ovens Installation & Start Up Manual

Process 10 - Product Door Assembly

Step 1 - Hanging the Product Doors d) Ensure that the door jambs have been anchored and the door opening is square and plumb before attempting to hang the doors . e) The door hinges have already been located and welded into position from the factory . f) Locate the proper door leaf per the Drawing Packet . > The barrel hinge on the door will be open to the bottom of the door .

g) Stand the door leaf and lift onto the barrel hinge pins . > Ensure there is a brass bushing on the barrel pin before door installation .

50

Made with FlippingBook - professional solution for displaying marketing and sales documents online