10 DETAILS THAT CAN DELAY YOUR AG EQUIPMENT MOVE Match Them Before Dispatch 1.Using The Wrong Dimensions Manufacturer specifications may not reflect attachments, tires, tracks or modifications. 2.Not Including The Header Or Implement The machine may be only part of the total shipment. 3.Guessing The Weight Transportation equipment and routing decisions may depend on accurate weight information as it is part of the equipment selection process. 4.Not Disclosing That The Machine Doesn’t Run Non-running equipment can require different loading resources. 5.Forgetting About Duals, Tracks Or Attachments Configuration affects the transportation profile. 6.Assuming The Farm Entrance Is Large Enough A large trailer may need considerably more room than normal farm traffic. 7.Not Checking Ground Conditions Soft, muddy or uneven ground can affect access to loading and unloading locations. 8.Waiting Too Long To Plan A Seasonal Move Planting and harvest deadlines don’t move just because transportation became difficult. 9.Using An Auction Listing As The Only Source Of Information Verify the actual machine before finalizing transportation. 10.Not Explaining The Real Delivery Deadline A transportation provider should understand when the machinery actually needs to be operational to optimize delivery. Important Planning Note This toolkit is intended as a general transportation-planning resource. Equipment preparation, loading, securement, trailer selection, routing, permitting, escort, regulatory and site requirements vary based on the specific machine, transportation equipment, carrier, route and jurisdiction. Applicable manufacturer instructions and shipment-specific transportation requirements should be evaluated before the equi pment moves.
Made with FlippingBook - Share PDF online