Ireland's Plumbing & Heating Magazine Issue 104 Nov-Dec

PROJECT

CHEEVERSCOURT&HALIDAYHOUSE, DÚNLAOGHAIRE

HEVAC SUPPLIES ADVANCED PRODUCTS FOR DOUBLE NZEB PROJECT… MECHANICAL SUPPLIERS

I reland’s leading commercial plumbing and heating specialist, Hevac, supplied Hamworthy boilers, Jeremias Flue, Wilo, Danfoss HIU’s and pipe and fittings to nZEB Cheevers Court and Haliday House project for mechanical contractor, Kerrigan Mechanical. The apartments’ entire heating and domestic hot water requirements are catered for in the HIU, with energy consumption monitored to allow each customer to pay for the heat they use in a fair and equitable way. With a district heating system, as installed in Cheevers Court and Haliday House, there is no need to install gas pipes to each apartment. This removes the risks of gas leaks or explosions and carbon monoxide poisoning. Hot water is heated only when needed, and it heats instantly. Karl Carrick, Director at Hevac explained, “Whether you just want to wash

your hands or run several showers simultaneously, Danfoss HIU’s keep pace with the requirements. Instant DHWmeans never running out of hot water and, of course, there is no storage cylinder meaning stored hot water never goes to waste and valuable storage space in the apartment is freed up.” The Hamworthy Wessex Modumax mk3 boilers are high-efficiency, condensing boilers with up to 95% gross seasonal efficiency. The mk3 upgrade has been developed in direct response to the increased use of wider delta T design methodologies in commercial buildings and district heating systems, such as Cheevers Court. Other benefits include lightweight, space-saving design and low water content to enable rapid response to heat demand. Exclusively available in Ireland from Hevac, the Jeremias DW-ECO flue system

is a twin-walled, factory-made, stainless steel chimney system with inner liner in 304 (gas and oil in dry conditions) or inner liner in 316 (solid fuel, biomass and condensing applications), a 25mm rigid rock wool insulation and a 304 outer liner. Due to its superior design there are no hot spots or thermal bridges between inner and outer liner, allowing the lengths to be cut on site - useful for difficult installations. Hevac also supplied a DWKL CHP flue. Commenting on the successful delivery of the project, Karl said, “Throughout this project, Hevac has worked closely with Kerrigan Mechanical’s on site team. We are delighted to have contributed to the successful completion of this prestigious apartment projects.”

T: +353 (0)1 4191919 E: info@hevac.ie www.origen.ie

FOLLOW US ON:

www.plumbingmag.com

PLUMBING & HEATING MAGAZINE | 67

Made with FlippingBook - professional solution for displaying marketing and sales documents online