Board Converting News, April 1, 2024

Step-By-Step Guide (CONT’D FROM PAGE 26)

Board Converting NEWS INTERNET DIRECTORY

Set up the building, general infrastructure, and production equipment, ensuring proper installation and compliance with design. Track & manage progress, timelines, work quality, and budgets to ensure a successful and timely project completion. • Coordinate contractors and subcontractors to ensure seamless progress. • Establish a construction schedule that outlines key milestones and deadlines. • Manage the acquisition and delivery of construction materials efficiently to prevent delays, cost overruns, and potential shortages. • Establish a system to regularly report on construction progress, documenting milestones, changes, and any deviations from the original plan. • Monitor construction quality and adherence to design specifications. • Develop contingency plans to address potential dis- ruptions, such as weather-related delays or unforeseen site conditions. • Design and Install efficient HVAC systems for tempera- ture and humidity control. • Host re-occurring meetings with contractors and equip- ment vendors to ensure proper coordination. • Visit the site frequently to check progress and carry out quality control measures. • Implement comprehensive tracking measures to stay ahead of potential delays. This includes detailed equip- ment delivery lists for corrugator and converting equip- ment arriving from overseas, procurement lists for ma- terial, and detailed vendor schedules. • Enforce safety standards to protect workers and en- sure compliance with occupational health and safety regulations. • Integrate fire suppression and detection systems, such as sprinklers and smoke detectors. • Coordinate installation of telecommunications infra- structure. • Implement backup power systems like generators or uninterruptible power supply (UPS) units. • Design and install waste disposal systems, including wastewater management and recycling facilities. • Set up security systems, including surveillance cam- eras and access control, to protect the facility and its assets. • Maintain an ongoing list of remaining final work items that must be completed before the construction project is considered complete. Step 6: Equipment Installation Collaborate with equipment suppliers to ensure prop- er installation of machinery. Verify alignment, functionality, and integration within the facility. • Collaborate with suppliers to ensure proper installation of specialized equipment.

THE HAIRE GROUP www.hairegroup.com

Haire Group is the premier provider of new machinery for the corrugated industry. From the Apstar line of flexo folder gluers and rotary die cutters, the Encore line of flexo folder gluers and rotary die cutters, and the Engico flexo folder glu- er, Haire is able to pair clients with the best machinery solu- tions for the best value to meet their needs. Haire Group’s service department helps its customers maximize uptime and profitability through superior 24/7 service and support, a pre-install training center, and over a million dollars’ worth of spare parts at their offices just outside of Chicago. Haire Group has been the industry’s #1 pre-owned machinery bro- ker and plant equipment appraiser since 1976. HarperLove is the leading provider of specialty adhesives, performance additives, and wet-strength resins to corru- gated packaging manufacturers. With the largest and most experienced field service and technical support team posi- tioned throughout the U.S. and Latin America, HarperLove has a long-standing reputation for providing outstanding service and delivering demonstrable performance improve- ments. HarperLove’s renowned services include not only innovative product development and custom product for- mulation, but also machine and process assessments, ad- hesive formula adjustments, machine tuning, detailed ser- vice reporting, and more. HARPERLOVE www.HarperLove.com Kernic Systems has been a leading global provider of re- cycling equipment solutions since 1978. For over 40 years, Kernic Systems has provided balers, air conveying and dust collection systems, shredders, industrial vacuums, and re- cycling equipment to a wide range of markets. Today, Ker- nic Systems serves customers with an expanded offering of standard products and custom-engineered systems through three primary business divisions: Recycling Solu- tions, Dust Collection and Air Pollution Control, and Material Handling. Kiwiplan provides state-of-the-art software solutions to cor- rugated, folding carton, plastics and flexible packaging fa- cilities around the globe. Kiwiplan’s Total Solution delivers comprehensive, seamless real-time flow of information from sales order management to dynamic total plant scheduling and inventory control through shipping. With deep manu- facturing and distribution expertise, Kiwiplan knows the specific problems customers face and provides the spe- cialized software they need to adapt, compete, and win in today's rapidly changing world. KERNIC SYSTEMS www.kernicsystems.com KIWIPLAN www.kiwiplan.com

CONTINUED ON PAGE 30

28 April 1, 2024

www.boardconvertingnews.com

Made with FlippingBook - professional solution for displaying marketing and sales documents online