Transition Zone
Mini Ring Timing for mini ring prevention based on university research begins in the mid-summer when the average soil temperature at a 2” depth taken at 11 am reaches 80ºF for three consecutive days. Applications should be watered in with 0.125 - 0.25”.
Application
Product and Use Rate per 1,000 sq. ft.
1st app. 80°F soil temp
Densicor ® 0.196 fl oz or Resilia TM 4 fl. oz.
2nd app. 28 days later
Mirage ® Stressgard ® 1 fl. oz.
3rd app. 28 days later
Densicor 0.196 fl oz or Resilia 4 fl. oz.
Take-all Root Rot Timing for take-all root rot preventation based on university research begins in mid- to late-summer when the average soil temperature at a 2” depth taken at 11 am declines below 85ºF for three consecutive days. Applications should be watered in with 0.125-0.25” and may need to be continued in extended mild and wet falls.
Application
Product and Use Rate per 1,000 sq. ft.
1st app. <85°F soil temp in mid-to-late summer
Tartan ® Stressgard ® 2 fl. oz.
2nd app. 21-28 days later
Densicor ® 0.196 fl oz or Resilia TM 4 fl. oz.
3rd app. 21-28 days later
Tartan Stressgard 2 fl. oz.
4th app. 21-28 days later
Densicor ® 0.196 fl oz or Resilia 4 fl. oz.
Made with FlippingBook - Online Brochure Maker