4.4 Unpacking the System
The HVR100 system arrives in one crate that includes all components of system including the system PC and monitor. The metrology unit arrives in the horizontal position.
Unpacking Tools
The following items are required to uncrate and install an HVR system:
• Battery powered drill with Phillips bit (to remove the top of the crate)
• Bubble level (optional, to level workbench or workstation)
Other common hand tools
•
The metrology unit includes a permanent handle at the top of the unit (see the figure below) and two handles at the base of the unit. The threaded handles at the base of the unit can be removed or left on the system to facilitate possible later lifting. Specifically, the handles can be used to rotate the system from the vertical to horizontal position. See the “System with Carrying Handle Attached” figure in Section 5 of this document.
Unpacking Instructions
To unpack the system refer to the following figures and perform the following steps:
The HVR100 system weighs 106 pounds. Do not attempt to move the system without proper assistance.
1. Using a drill with a Phillips screw bit, remove the screws that attach the top of the crate. 2. With the crate now open, use the drill to remove the four woodscrews that secure the wood crossbeam holding the metrology unit in place. 3. With a person on each side of the metrology unit, use the handles to lift the unit in place. 4. Unpack the remaining components in the crate including the system PC, monitor and supporting hardware.
21
Made with FlippingBook - professional solution for displaying marketing and sales documents online