KMR Manual

7.2 Unpacking Shipping Boxes KineMic systems other than the KineMic KMR-200-M3 (with a 200 mm encoder stage) are shipped in two cardboard boxes with foam inserts: one box for the metrology unit and another box for the system’s XGA monitor or 24” touch-screen monitor and Shuttle PC. Unpack carefully so as not to miss cables, documentation, or software CDs. KineMic systems are shipped to users with all software installed. Verify that your system is complete as listed in the above table.

KMR-200-M3 crate with screw locations in red KMR-200-M3 crate with lid and front removed

The KineMic KMR-200-M3 (with a 200 mm encoder stage) is shipped in a single wooden crate. Use a power screwdriver to remove 8 Phillips screws from the lid and 6 Phillips screws from the front side. The 14 screw locations are marked in red. Remove the lid and front side of the crate, then carefully remove the contents of the crate from the open side.

7.3 Removing Red Shipping Tabs

Starrett Kinemetric X-Y stages use metal tabs to prevent movement during shipment. Painted red for easy identification, these are intended to be removed once the equipment has been placed in its final position. Look for red tabs and remove them before attempting to move the stage. You may wish to store the tabs and their mounting screws for a possible later move of the equipment.

7.4 Placing the Equipment A clean working environment free from dust and fumes is recommended to keep the equipment clean and prolong its life. Place the equipment on a benchtop or a desktop at a convenient working height. Allow enough room to allow for stage motion, to store the parts to be inspected and measured, and for paperwork. Do not place brick type AC power adapters directly on the floor if the floor can be flooded for wash-down.

- 35 -

Made with FlippingBook - professional solution for displaying marketing and sales documents online