5. Installing and Setting Up the System
SKE systems are normally installed by a factory-trained installer who also provides operator training. The following information covers basic hardware installation in case an installer is not available.
Figure 6. HDV Dimensioned Outline Drawing
5.1 Required Tools and Equipment
The following items are required to uncrate and install HDV300 or HDV400 metrology systems:
• Forklift or pallet cart (to move shipping crate inside building).
• Battery powered drill with Phillips bit (to remove top and sides of shipping crate).
• Two crescent wrenches (to remove screws that attach shipping tabs to the crate, also to adjust the height of feet of the cabinet stand and metrology unit). • Two 5 foot (1.2 meter) long pipes, ¾ inches (20 millimeters) in diameter (to create temporary lifting handles).
• Bubble level (to level pedestal and main unit).