• Two rocker switches on the front column of the system labeled PC Monitor Power and M3 Amp Power.
• The switch labeled PC Monitor Power supplies power to the PC and monitor.
• The switch labeled M3 Amp Power provides power to the remaining components in the system.
For normal operation, the rocker switches should always be in the On position marked “I”. Refer to the following figure.
Figure 22. Power Control at the Front Column of the System
6.3.1 Powering Up the System
To apply power and start the system, perform the following steps:
1. Push the Power switch at the rear of the system (Figure 21) to the position marked “|” (On).
2. Push the PC Monitor Power and M3 Amp Power rocker switches (Figure 22) to the position marked “ | ” (On). This action enables the built-in PC to self-boot and come up in Windows.
3. Launch the MetLogix M3 software by clicking on the M3 icon on the monitor.
4. Proceed to “ Verifying Basic M3 Software Operations ” later in this section for information on initializing the M3 software.
Made with FlippingBook - professional solution for displaying marketing and sales documents online