MVR Manual

5.2 Moving the Equipment

MVR metrology units are shipped in a wooden shipping crate. Use a forklift or pallet cart to move the crate within the building to the final location where the system will be installed. Exercise care in handling the unopened shipping crate, as excessive force or a drop may damage its contents.

5.3 Uncrating the Equipment

Detailed instructions for uncrating the MVR system are available in the AVR and MVR Video Metrology Series Systems Unpacking Read Me First Instructions shipped with the system.

Tool Requirements

The following items are required to uncrate and install an MVR system:

• Battery powered drill with Phillips drill bit

Crescent wrench

• Bubble level (optional, to level workbench or workstation).

Other common hand tools.

Procedure

To uncrate the MVR system, refer to the following figure and perform the following steps:

1. Remove the screws on the top of the crate and carefully remove the top.

2. Remove one of the side panels for access to the contents.

3. Remove and unpack all components.

4. Verify that the contents match the packing checklist included in the documentation packet.

Figure 8. Removing Screws from the Shipping Container

Made with FlippingBook - professional solution for displaying marketing and sales documents online